Project Portfolio
Review our Project Portfolio for proof of Chemic’s years of experience. If you have questions about any of the information shown here, please contact us.
To see a map of locations that Chemic has worked in click here.
Benzene Line Upgrade to Lab
Designed Piping upgrade for Benzene Line.
Category: MaintenanceMarket: ChemicalLocation: USAVerify Emergency Relief System
Verify emergency relief systems for vessels, make reccomendations as required to meet Standards.
Category: MaintenanceMarket: ChemicalLocation: USA70R101-2 Install Sample Valve
Installed sample valves at cyclone steam quench connections.
Category: MaintenanceMarket: ChemicalLocation: USAPull 70XV411
Pulled 70XV411 and replaced with Spool Piece, 84" Diameter Piping.
Category: MaintenanceMarket: ChemicalLocation: USAReplace Nitro Purge #24
Replaced nitrogen purge with a fuel gas purge.
Category: MaintenanceMarket: ChemicalLocation: USADistribution Safety Showers
TIC Estimate for the addition of three new Safety Showers.
Category: MaintenanceMarket: ChemicalLocation: USANew TK -VK Control Room
Building specification & design work associated w/construction of new control room. Included layout study, architectural design, civil design for foundation & drainage,lighting,utility piping & structural steel for stairs & connector to operating platform
Category: MaintenanceLocation: USANew TK Cooling Tower
Detailed design for new packaged cooling tower and circulating pumps installation. Included equipment specification, piping design, civil & structural design, and instrument and electrical design.
Category: MaintenanceLocation: USAShutdown Interlock Testing
Provided Shutdown Interlock Testing and Documentation.
Category: MaintenanceMarket: ChemicalLocation: USAOnsite Piping Designer
Onsite Piping Designer
Category: MaintenanceMarket: ChemicalLocation: USARelief Valve Change Recommendation for Both 320T247-1&2
Designed Relief Valve Changeout for 320T247-1&2, including inlet and outlet piping.
Category: MaintenanceMarket: ChemicalLocation: USARepair Bank Erosion Docks
Designed repairs to Docks Bank to prevent Erosion.
Category: MaintenanceMarket: ChemicalLocation: USAButane KOH Treater Inlet Relief Valve
Detailed engineering & design (Mechanical). Project consisted of revising existing piping in the unit. This job consisted of adding block values and control valves.
Category: MaintenanceMarket: RefineryLocation: USAIWPF Tank Sludge Cleaning
Process Evalution. TIC Estimate for Solids Removalfrom Tank.
Category: MaintenanceMarket: ChemicalLocation: USACarbon Canister Project
Detailed engineering and design (Mechanical). Project consisted of adding carbon canisters/filters to existing unloading station thru out Marathon.
Category: MaintenanceMarket: RefineryLocation: USALandfill Cell #5
Calculations for Fill Area if Access Ramp relocated.
Category: MaintenanceMarket: ChemicalLocation: USAUpdate EFD'S for 350 Area
Perform EFD Walkdowns and update all files to CAD.
Category: MaintenanceMarket: ChemicalLocation: USAPipe Ditch/Overhead Rack Survey & Identification
Survey and document Piping in Ditch/Overhead Racks for Maintenance purposes.
Category: MaintenanceMarket: ChemicalLocation: USABridge #10 Repair
Designed repairs for Bridge Columns and Footers.
Category: MaintenanceMarket: ChemicalLocation: USAReplace Sections of NESHAP Piping pre MTS Recommendations
Designed replacement piping for corroded piping, like for like.
Category: MaintenanceMarket: ChemicalLocation: USADike Wall Erosion Repairs
Designed repair for leak in concrete Dile Wall.
Category: MaintenanceMarket: ChemicalLocation: USARepair Damageg Structural & Piping at 70XV114-2 (S/D 104)
Designed repairs for damaged structural steel and piping.
Category: MaintenanceMarket: ChemicalLocation: USA70C101 Air Compress System Repairs, 24" Steam Line to C101
Stress Calculations on 24" Steam Line, designed Stop & Support to prevent damage..
Category: MaintenanceMarket: ChemicalLocation: USAReplace Pilot Ignition System on Reactor Air Heater
Replaced pilot ignition system on reactor air heaters.
Category: MaintenanceMarket: ChemicalLocation: USADocument/Redline/Change 24VDC Power Distribution
Updated Unit Documentation on 24 Volt Power System
Category: MaintenanceMarket: ChemicalLocation: USARepair Nat Gas Line (E & 7th St. Area)
Designed repairs for natural gas line (E & 7th street) area.
Category: MaintenanceMarket: ChemicalLocation: USAMarch 2006 HPDA Outage Work
Designed Piping to replace 4 existing instruments with upgraded instruments.
Category: MaintenanceMarket: ChemicalLocation: USAPlatform for portable water filters
TIC Estimate and Design for Access Platform.
Category: MaintenanceMarket: ChemicalLocation: USACost Estimate for 320T161's Radar Access Platform
TIC Estimate for 320T161's Radar Access Platform.
Category: MaintenanceMarket: ChemicalLocation: USAReplace Sump Line Between
Designed replacement of Sump Line.
Category: MaintenanceMarket: ChemicalLocation: USA450# Steam Line Sleeper Repair "F" Street
Designed in Structural repair for broken Concrete Sleeper.
Category: MaintenanceMarket: ChemicalLocation: USAReplace the "C" Street Domestic Sewer Line
Designed the replacement piping for the "C" Street Domestic Sewer Line.
Category: MaintenanceMarket: ChemicalLocation: USAReplace Domestic Sewer Line from S2 Sump
Designed the replacement piping for the S2 Domestic Sewer Line.
Category: MaintenanceMarket: ChemicalLocation: USACulvert Replacement
Design Culvert replacement and area Grading for Drainage.
Category: MaintenanceMarket: ChemicalLocation: USAInterlocks
Update and verify interlock types, service, and descriptions.
Category: MaintenanceMarket: ChemicalLocation: USAConduct Expansion Loop Calc. on the 450#
Conduct expansion loop calculations on the 450# steam headers, including the conditions When Unit is exporting 700 degree steam into the header.
Category: MaintenanceMarket: ChemicalLocation: USADemo Out of Service Electrical on the Docks
Cleaned up the electrical on dock 4.
Category: MaintenanceMarket: ChemicalLocation: USAReverse Osmosis Tank Outage
Repaired tank and nozzles, reworked piping for streamlined operations.
Category: MaintenanceMarket: ChemicalLocation: USAHydraulic Study of Cooling Tower System
Preformed Hydralic Study of efficiency of Unit Cooling Tower Water System.
Category: MaintenanceMarket: ChemicalLocation: USAInstall Cross Stopple on the 450#s STM Line
Design installation of cross stopple on the 450# steam line in "F" st. pipe ditch for Maintenance.
Category: MaintenanceMarket: ChemicalLocation: USARelief Systems Phase II
PSV (relief valve) verification and documentation.
Category: MaintenanceMarket: ChemicalLocation: USASTS Equipment Conversion
Updated EFD and Equipment Documentation after Demo of Unit for all Equipment that was saved and reused. Renumbered Equipment and Drawings as required.
Category: MaintenanceMarket: ChemicalLocation: USA83E13 TIC Upgrade
Upgraded temperature controllers.
Category: MaintenanceMarket: ChemicalLocation: USAReplace Firewater Lines Project - Phases 6 & 7
Detailed design of a new underground fire water piping system for a large refinery tank farm. Included pipe routing and installation details and civil design related to trenches.
Category: MaintenanceMarket: RefineryLocation: USAT311 Low Water Draw and Recycle Line Revision
Modified piping to do away with low water draw on tank.
Category: MaintenanceMarket: ChemicalLocation: USAT56-1 Storage Tank Repair
Converted manual drawings of Tank to CAD, including coils, plan, and elevation. Update dimensions as required.
Category: MaintenanceMarket: ChemicalLocation: USAInstall Flow Meters on 55E6'S
Replaced mass flow meters.
Category: MaintenanceMarket: ChemicalLocation: USAWHB Reliability Improvements
Upgraded gas controls.
Category: MaintenanceMarket: ChemicalLocation: USAStructural Steel, Grating & Floor Plate Replace
Structural steel, concrete and floor plate replacement.
Category: MaintenanceMarket: ChemicalLocation: USARepair Damaged Steam Piping
Draw EFD's of utility piping in "C" street ditch from 7th to DPO, complete turn in of all dwgs from outage.
Category: MaintenanceMarket: ChemicalLocation: USASulfuric Acid Line Replacement
Replace sections of sulfuric piping in ditches per MTS recommendations.
Category: MaintenanceMarket: ChemicalLocation: USAHAZOP Related Project
Designed 30D5 filter drain revisions, 30RI vent revisions and 30T2 sulfuric acid revisions.
Category: MaintenanceMarket: ChemicalLocation: USASouth Teal Unit # Ethylene Capping
South Teal Unit # Ethylene Capping
Category: MaintenanceMarket: ChemicalLocation: USARCRA Line Repair
Replace section of pipe in ditch like for like.
Category: MaintenanceMarket: ChemicalLocation: USAP&ID Updates
Updated old P&ID's for multiple units, including walk-down and drafting.
Category: MaintenanceLocation: USAMCS Sump Piping Replacement
Replaced the sump piping like for like with an updated spec.
Category: MaintenanceMarket: ChemicalLocation: USAChlorine Transfer Line
Chlorine Transfer Line
Category: MaintenanceMarket: ChemicalLocation: USAOn Dock 5
Redesigned piping to remove old emission points and unused PSV's and replace with new pipe.
Category: MaintenanceMarket: ChemicalLocation: USA51D6 TETF Alternate
Designed installation of 3" C.S. line from connection @ 51D6 to west side of unit (No pockets). A temporary scrubber will be supplied and shall connect to 3" line from 51D6
Category: MaintenanceMarket: ChemicalLocation: USAC4/Truck Flare Flow Estimation (85%)
Flare calculations for air permit application.
Category: MaintenanceMarket: ChemicalLocation: USAA300 Revisions
Designed new piping from Unit to 320T523 Storage Tank. Designed new piping for Benzene recycle line and new piping for a fresh benzene line.
Category: MaintenanceMarket: ChemicalLocation: USAT1 T2 Quick Switch Piping
Piping design and process engineering assisting the maintenance group to more efficiently switch between T1 and T2 mix tanks.
Category: MaintenanceLocation: USACombustion Air Line Sizing
Process engineering associated with sizing combustion air lines.
Category: MaintenanceLocation: USA8000 Wire Revision
Update existing wiring diagrams
Category: MaintenanceMarket: ChemicalLocation: USARelocate and Replacement of Flow and Pressure Transmitters
Detailed Design of relocation and/or replacement of Flow and Pressure Transmitters
Category: MaintenanceMarket: ChemicalLocation: USAIntercooler Project
Category: MaintenanceMarket: PowerLocation: USAEngineering and Design for Storm Water Pond 7
Category: MaintenanceLocation: USAFuel Gas Line, Hot Stopple and Line Repairs
Replace Bad Piping
Category: MaintenanceMarket: ChemicalLocation: USADenox Celite Bag Unload Station
Specify and provide detailed design for a solids bag unloading station, complete with mechanical, piping, structural, electrical systems.
Category: MaintenanceLocation: USASite Plot Plan
Developed a scaled site plot plan to consolidate individual plans and survey information.
Category: MaintenanceLocation: USAReplace Raff II Barge Loading Pipeline
Replacement of existing piping with line size increase from 8 inch to 10 inch on new piping.
Category: MaintenanceMarket: ChemicalLocation: USAAromatics Storage Tank PH I Def
Scope definition and estimate for changing services of existing aromatics tanks. Included line sizing, checking pump NPSH, preliminary piping design and estimating.
Category: MaintenanceMarket: RefineryLocation: USAAromatics Storage Tank PH I-A
Detailed design of piping required to change services of existing aromatics tanks, including a new 12-inch diameter suction line. Work involved piping, civil, and structural design.
Category: MaintenanceMarket: RefineryLocation: USAPortable Water Line
TIC Estimates and Front End Engineering for replacement of Potable Water Piping.
Category: MaintenanceMarket: ChemicalLocation: USA40R1-R2 Raw Materials Delivery
Design piping revisions for 40R1/R2 raw material delivery enhancement.
Category: MaintenanceMarket: ChemicalLocation: USA57T4 Reflux Tank Replacement
Designed additional steam tracing supply condensate return for vessel, Update P&ID's.
Category: MaintenanceMarket: ChemicalLocation: USAInstall Sonar Device on 57T20
Install sonar device, including wire pulling from MCC and new junction box.
Category: MaintenanceMarket: ChemicalLocation: USABoiler Fuel Gas Drawing
Replaced expansion loop in pipe ditch.
Category: MaintenanceMarket: ChemicalLocation: USAReplace Line II 40E16& 40E32 Heat Exchangers
Replaced Exchangers like for like.
Category: MaintenanceMarket: ChemicalLocation: USA150# Steam Line Repairs
Replaced damaged Steam Piping, performed Stress Calculations as required.
Category: MaintenanceMarket: ChemicalLocation: USAReplace Plant Railroad Bridge
Acquired Vendors for Railroad Bridge Replacement. Helped w/TIC Estimate.
Category: MaintenanceMarket: ChemicalLocation: USAReplace N. / S. Clean Water Ditch Diversion Valves
TIC Estimate and Front End Engineering.
Category: MaintenanceMarket: ChemicalLocation: USARepair Bank Erosion
Design repairs for bank erosion including Gunite installation on Banks, removal of sediment in ditch, and reworking drainage channels.
Category: MaintenanceMarket: ChemicalLocation: USAUpdate EFDs & Loop Drawings
Update formalin EFD's and loop drawings.
Category: MaintenanceMarket: ChemicalLocation: USARCRA Tank Cert 336T1&2 and 336T2-1
PE Certification for tanks used in RCRA service.
Category: MaintenanceMarket: ChemicalLocation: USA377N3 Agitator
Replace gear box and agitator.
Category: MaintenanceMarket: ChemicalLocation: USANew Radar Level Gauges 511/536
Installed two new radar level devices on two tanks.
Category: MaintenanceMarket: RefineryLocation: USAInstall Mud Boot Cross Stopple on the 50# Steam Line
Designed installation of cross stopple in mud boot in the 50# Steam Line for Maintenance.
Category: MaintenanceMarket: ChemicalLocation: USA