HIMO One Pass 1.5

Designed additional tee supports based on pipe stress calculations.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Upgrade Heater 02 Analyzers

Disigned Upgrade for Heater 02 Analyzers, including Nozzle Additions to Heaters and Platform for Access.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

40E1 Exchanger Replacement

40E1 Exchanger replacement, like for like.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

T48 Dike Area Elevation

Surveyed T48 inside Dike Area elevations and provided Plan Drawing w/Elevations. TIC Estimate for raising inside elevation to take area out of "Confined Space" Requirements.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Formalin 83R1 Redesign Screen and Support Grating

Formalin 83R1 Redesign Screen and Support Grating

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Install Dip Tube LI38 on T56-2

Designed Nozzle installation for Dip Tube LI38 on T56-2.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Transfer Electrical Upgrade

Category: Redesign-RetrofitLocation: USA

De-Superheating Water Let Down

Designed Piping for installation of de-superheating water letdown valve.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Coffeyvill CO2 Extend Line - LS

Category: Redesign-RetrofitMarket: PowerLocation: USA

55T16 Clean Out Ports

Designed Clean Out Nozzles on cone bottom of Tank.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

51D3 Feed Tank 51T14 Replace

TIC Estimate for Feed Tank Replacement.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Truck Rack Safety Upgrades

Designed Tie Off System for Loaders AT Truck Rack.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

320T302 Vent Additions and Nozzle, Piping Additions

Designed 320T302 Vent Additions, including Nozzle addition and Piping revisions.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

1710/LPVCM Loop Reactor PH1

LTC Reactor replacement with like kind. Total station and conventional field verification. Vendor drawing review. Vessel calculations review. Piping modifications. Field construction follow-up.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Redundant Temp. Transmit to 321TIC113 & 321TI112 for control XV114

Designed Redundant Temp. Transmitter System to 321TIC113 & 321TI112 for control of XV114.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Resize the Lube Oil Coolers on C504-1&2

Resized the Lube Oil Coolers on C504-1&2

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Install Tie Header at Dock 3 for Toluene Barge Loading

Designed Tie-in on Header Dock 3 for Toluene Barge Loading.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Isopentane / Isopar-E Project

Detailed engineering & design (Mechanical). This project consisted of revising existing piping adding block valves and control valves to change the routing of the existing piping system.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Flare Vent Line

Detailed engineering & design (Mechanical & structural). This project consisted of the piping design of a new flare vent line to replace the existing vent system. The existing piping rack system was modified to support the new line.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Phase 2 Engineering

Phase 2 Engineering

Category: Redesign-RetrofitLocation: USA

On-site LPVCM

On-site LPVCM

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

336SU12A & 12B Inst. Mod. And Upgrade Request

Designed upgrade Instrumentation for Sump Level Controls.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Alky Propane Shutdown Project

Detailed engineering/design (Mechanical, structural & I&E). Project added new vent lines into their existing vent system with Hot Taps. Structural department add a new extension to the existing platform on the top of the existing structure.

Category: Redesign-RetrofitMarket: RefineryLocation: USA

Hot Tap Toluene Unit Make Line

Designed Hot Tap installation for rerouting piping.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Relocate 50# Steam to Reactors Flow

Designed Piping to relocate 50# Steam Flow.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Install a DP Type Level Device on C101 Lube Oil System

Designed installation of DP Type Level Device on C101 Lube Oil System. Including new Nozzle Oil Tank.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

2 New Temp Transmitters

Designed Piping and Instrumentation to install 2 new Temperature Transmitters.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Improve 70H401 Superheat Section Reliability (DeSuperHeater)

Designed Piping for installtion of DesuperHeater, Spec'd DesuperHeater.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Temporary Crude AN Receiving

Design temporary piping for unloading Crude AN.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

T670 Emissions

Detailed engineering and design (Mechanical). Project consisted of re-routing existing piping and PSV's for the existing flare/vent system.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Move P805-3 to P805-2 Location to Facilitate Barge Loading from T804

Designed piping for relocation of Pump.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Install Bridge at "G" street and Dock Road

Designed Bridge for Ditch crossing.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Install PCV's on Equistar's Light Product storage tanks

Designed Piping to install PCVs on N2 Piping to Tanks.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Drainage Study

Studied existing drainage system @ Lab. The storm water was not draining properly; water standing in parking lot. For new catch basins and tied the storm sewer directly to city storm sewer system.

Category: Redesign-RetrofitMarket: RefineryLocation: USA

Feasibility engineering for underground piping project

Provided scoping and material labor estimate for client's yearly budget. Preliminary routings and costs were developed on this project.

Category: Redesign-RetrofitMarket: RefineryLocation: USA

Construct Elevated Platform in Pipe Rack South of 70C101

Designed Platform for Pipe Rack.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Install platform around T16

Designed access platform around T16 for Clean Out Nozzles.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Install Piping to Pump from 320P805-2 around 320P805-3

Designed Piping for Product Transfer Pump.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Design & Install Seal Pot w/Alarm to Control House from 320P976-2

Designed Piping and Seal Pot w/Alarm to Control House.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Middle Rack Secondary Containment-Preliminary Engineering & Estimate

TIC Estimate and Front End Engineering.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

70T105 Explosion Hatches

Designed Explosion Hatches for Tank.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

PO Rail Unloading at U1

R/C unloading rack expansion. Structural steel modifications with new gangway and cage. Piping modifications to include new control station, Micro motion flow meter and loading arm for Propylene Oxide.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Set up 70E202-3 as a Spare 70E503

Reworked piping so that existing exchanger could be used as spare for another service.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

HCL Replacement

Demo existing HCL system and replace with H2504 Tote System.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Hot stopple of 350T1-2 connecting line

Designed installation of cross stopple for installation of piping and valves for tank.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Cogen Desecrator Tank Replacement

Structural steel modifications for vessel replacement. R/R corroded steel with new.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

320T823-3 Piping Revisions

Designed Piping modifications on tank to install N2 Blanket..

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

CL2 Suction Chiller

Chlorine chiller expansion pot. Cold service piping and stress analysis. Four new pumps and control stations.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

P1 Sugar Feed to D-101

Structural steel modification for pneumatic sugar feed to reactor to sustain piping and bag house on top of reactor.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

LPVCM-Railcar Fall Protection

Update railcar gangways, safety cages and for loading VCM, Chlorine and R/C cleanout. 8 spots.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Re-route 10 PSV's back to 320T971-1

Designed piping to re-route 10 PSV's outlet piping back to 320T971-1.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Acid Purge

TIC Estimate forAcid Purge Revisions. Project Canceled.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

On-site LPVCM

On-site LPVCM

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Waste Water Compliance Project

Designed Slab for Instrumentation

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

HRVOC

Emission control mechanical detail design project. New control station, piping, revisions.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Absorber Off Gas Revisions

Design Double Block and Bleed by adding 30 inch butterfly valve

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

TET Pump Controls Upgrade

Category: Redesign-RetrofitMarket: RefineryLocation: USA

Change 55PCV108-1/2/3 to Butterfly Control Valves

Design replacement piping to change control valves to butterfly type valves.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

MP Boiler Feed water Pump Recirculation Line

Redesign piping for boiler feed water pumps for better work clearances.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

70T204 Settling Revisions

Design new overflow system for Settling Tank.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Fee Support for R&D Relocation

Fee Support for R&D Relocation

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

HRVOC Monitoring Compliance Project

Designed Nozzle connections on Flares for Flow Instrumentation Installation and design barricades for Instrument Boxes.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Modify Docks 2 & 3 Flush Headers & Sample Pts

Designed new piping on dock 3 to make sure there is not cross contamination of Products.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Add Zeolite Waterline to 83S14

Run new 2" stainless steel pipe and change out part of zeolite water pipe.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Add Additional Venting Per Equistar to 320T92

Designed additional venting, including Nozzle and Conservation Vent.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

CT3 Piping & Electrical Replacement

Piping and electrical replacement.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

HPM BLDGS A

Detailed civil design of access roadway to new plant facility.

Category: Redesign-RetrofitLocation: USA

HPM Building Compliance Phase II

Engineering and design for Hazardous Process Materials storage facilities. Work included code compliance studies, architectural design, civil and structural design, instrument and electrical design and piping design.

Category: Redesign-RetrofitLocation: USA

Install Redundant XV's on 70K305-1 Drain Line

Designed installation of redundant Control Valves on the 70K305-1 drain line.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Revise Circulating Water Purge Piping

Revised circulating water purge piping.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

PSV Header at VCM Tank Farm

VCM Sphere tank farm header thermal expansion PSV's and expansion pot. New design. Foundations and piping.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Formalin Tank Hi Level Improvement

Install new 2"-150 nozzles in existing tank manways. Install new Hi level probes and remove existing Hi level probes and install blind flanges as requied.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Upgrade SO2 Flow Meters

Upgraded SO2 flow meters. Redesigned piping for new meters.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

D308 Bottoms to D203 Bottoms

Piping project canceled

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

TK Drum Breaker/Conveyor System

Preliminary mechanical and civil design for a solids flake breaker installation.

Category: Redesign-RetrofitLocation: USA

MAPL Pipeline Expansion

Detailed engineering and design (all disciplines) to increase capacity of gasoline pipeline. Scope included specification for cleaning and hydrotesting pipeline.

Category: Redesign-RetrofitMarket: RefineryLocation: USA

Enclosure for R-1002A&B Design

Enclosure on top of existing reactor structure. Add. steel structure framing, building roof & metal siding were added on top of existing reactor. For prevention of outside moisture reacting w/catalyst during installation of new catalyst in the reactor.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

LPG Tank Overfilling and Atmospheric Relief Project

Mechanical, electrical, civil, and instrumentation front end engineering, to implement instrumentation for prevention of tank overfilling.

Category: Redesign-RetrofitMarket: RefineryLocation: USA

Tails Dryer Potable Water System

Process detail design to perform hydraulic study, tank sizing, pump sizing, safety showers to comply with OSHA specifications.

Category: Redesign-RetrofitLocation: USA

MHF #3 and #4 Blowers Clean Air Suction Duct Project

Mechanically redesign of duct system and platforms resulting in effective filtering of process dust.

Category: Redesign-RetrofitLocation: USA

DSM Screen Relocation

Analyzed a four story structure and used doppler radar to anaylze the foundations and certify capacity for handling additional weight associated with ball mill process.

Category: Redesign-RetrofitLocation: USA

Contaminated Water Storage Tank A Replacement

Mechanical, civil, structual, instrument, and electrical detailed design for replacement of storage tank.

Category: Redesign-RetrofitMarket: Natural GasLocation: USA

Jundia Gas Compression Project

Balance of plant mechanical and structural detailed design for the relocation of an existing gas compression facility. Facility includes four gas compressors and associated equipment.

Category: Redesign-RetrofitMarket: Natural GasLocation: Global

Flare Replacement IMPR Phase 2 (Second part of 7010)

Detailed Design and Field Follow-up of Installation of Piping for Flare Replacement

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Fabrication Drawings Vertical Riser

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Burner Management System Upgrade

Piping Revisions for Upgrade of Furnace Burner Management System

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

CAT Charge Line Project

Piping detailed design

Category: Redesign-RetrofitMarket: RefineryLocation: USA

Emergency Muster Reader Project

Instrumentation detailed design

Category: Redesign-RetrofitMarket: RefineryLocation: USA

Tank Replacement

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Build Road Grating Crossing to Cover Exposed Piping at Dock Road

Replace Road Crossing Over Piping

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Upgrade Ven System on 320T233-1

Replace N2 System on Tank

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Emergency Muster Reader Project

Intrumentation detailed design

Category: Redesign-RetrofitMarket: RefineryLocation: USA

Upgrade Slurry Manifold

Piping detailed design

Category: Redesign-RetrofitMarket: RefineryLocation: USA

Substation Upgrades #2

Piping detailed design

Category: Redesign-RetrofitMarket: RefineryLocation: USA

Solvent Sewer Integrity Project

Piping detailed design

Category: Redesign-RetrofitMarket: RefineryLocation: USA

Tars B Tank Replacement

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Substation Upgrades

Piping detailed design

Category: Redesign-RetrofitMarket: RefineryLocation: USA

Flare Pilot Gas Lines - Part 1

Replace existing Piping

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Provox Upgrade

Upgrade Provox System

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Roof Modifications

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Upgrade HCN Low Flow

Upgraded HCN flow meters. Redesigned piping for new meters.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

KOH Storage Cap Increase

Detailed engineering and design for a potassium hydroxide storage tank, including pumps, piping, civil, instrument, and electrical.

Category: Redesign-RetrofitMarket: RefineryLocation: USA

55R4 HCN Analyzer

Designed piping and instrumentation for installation of HCN analyzer.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Tank Farm Instrument Upgrade

Designed upgrades for Level Control Instrumentation.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

HRVOC Analytical Test

TIC Estimates and design of installation of flanged outlets on flare stacks for Flow Instruments.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Absorber Off Gas Vent Revisions

Designed Double Block and Bleed by adding 30 inch butterfly valve

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Flare Knockout Pot Revisions

Designed replacement can on Flare.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

TSS Solids Analyzers

Modified piping and added instrumentation for analyzing process wastes.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Piping Modification on Propylene Pumps

Modified piping configuration to streamline operations.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

CWD Diversion Valves

Revision of concrete outfall dam to install slide gate valves, replacement of diversion gate valves, and removal of catwalk.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

55H2 Burner Management Upgrade

TIC Estimate for upgrading Piping and Instrumentation Controls of Heater Burner System.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

55H2 Burner Management Upgrade

Design upgrade for Piping and Instrumentation Controls of Heater Burner System, including Gas Flow Calculations..

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Potable Water Distribution Header Study

TIC Estimate for replacement of plant potable water supply system.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Overhead Cyanide Pipe Support

Design repair of damaged Overhead Cyanide Pipe Support.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

C St Steam Lines Modification

TIC Estimates for redesigning the Plant 450# Steam Supply System. Installed thermowells for Temperature Instrumentation and Tie-ins for Future Piping.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Propylene Area Tie Points

Cleaned up excess piping not needed with miscellaneous piping modifications.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Install and Test Thermo-Degasser for 30C2 Oil System

TIC Estimate for Installation and Testing of Portable Thermo-Degasser for 30C2 Oil System.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Install and Test Thermo Degasser for 30C2 Oil System

Designed piping for installation of Portable Thermo-Degasser for 30C2 oil System. Help with Testing Procedures.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

New T 315 CVO Assembly

Modified piping atop of tank to keep vent system from polymerizing.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

57T5 Vent to 55H2 Furnace

Addition re-pulls of bad cable, redesign using interposing relays because of induced voltages.

Category: Redesign-RetrofitMarket: ChemicalLocation: USA

Route Sour Water Drains From U11 & U14 to U28

Mechanical, electrical, civil, and instrumentation detailed design for piping collection system to send sour water to a production unit instead of oily water sewer.

Category: Redesign-RetrofitMarket: RefineryLocation: USA

U68 Diesel Dye Injection System

Mechanical, electrical, civil, and instrumentation detailed design for upgrade for truck loading facility with a dye injection system.

Category: Redesign-RetrofitMarket: RefineryLocation: USA

U120 Main Gate Security Bldg Replacement

Mechanical, electrical, civil, and instrumentation detailed design for replacing existing main gate security building with explosion resistant modular building.

Category: Redesign-RetrofitMarket: RefineryLocation: USA

Install EIV's on TK-39 & 423

Installed emergency isolation valves for tank farm.

Category: Redesign-RetrofitMarket: RefineryLocation: USA