Project Portfolio
Review our Project Portfolio for proof of Chemic’s years of experience. If you have questions about any of the information shown here, please contact us.
To see a map of locations that Chemic has worked in click here.
HIMO One Pass 1.5
Designed additional tee supports based on pipe stress calculations.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAUpgrade Heater 02 Analyzers
Disigned Upgrade for Heater 02 Analyzers, including Nozzle Additions to Heaters and Platform for Access.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA40E1 Exchanger Replacement
40E1 Exchanger replacement, like for like.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAT48 Dike Area Elevation
Surveyed T48 inside Dike Area elevations and provided Plan Drawing w/Elevations. TIC Estimate for raising inside elevation to take area out of "Confined Space" Requirements.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAFormalin 83R1 Redesign Screen and Support Grating
Formalin 83R1 Redesign Screen and Support Grating
Category: Redesign-RetrofitMarket: ChemicalLocation: USAInstall Dip Tube LI38 on T56-2
Designed Nozzle installation for Dip Tube LI38 on T56-2.
Category: Redesign-RetrofitMarket: ChemicalLocation: USATransfer Electrical Upgrade
Category: Redesign-RetrofitLocation: USADe-Superheating Water Let Down
Designed Piping for installation of de-superheating water letdown valve.
Category: Redesign-RetrofitMarket: ChemicalLocation: USACoffeyvill CO2 Extend Line - LS
Category: Redesign-RetrofitMarket: PowerLocation: USA55T16 Clean Out Ports
Designed Clean Out Nozzles on cone bottom of Tank.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA51D3 Feed Tank 51T14 Replace
TIC Estimate for Feed Tank Replacement.
Category: Redesign-RetrofitMarket: ChemicalLocation: USATruck Rack Safety Upgrades
Designed Tie Off System for Loaders AT Truck Rack.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA320T302 Vent Additions and Nozzle, Piping Additions
Designed 320T302 Vent Additions, including Nozzle addition and Piping revisions.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA1710/LPVCM Loop Reactor PH1
LTC Reactor replacement with like kind. Total station and conventional field verification. Vendor drawing review. Vessel calculations review. Piping modifications. Field construction follow-up.
Category: Redesign-RetrofitMarket: ChemicalLocation: USARedundant Temp. Transmit to 321TIC113 & 321TI112 for control XV114
Designed Redundant Temp. Transmitter System to 321TIC113 & 321TI112 for control of XV114.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAResize the Lube Oil Coolers on C504-1&2
Resized the Lube Oil Coolers on C504-1&2
Category: Redesign-RetrofitMarket: ChemicalLocation: USAInstall Tie Header at Dock 3 for Toluene Barge Loading
Designed Tie-in on Header Dock 3 for Toluene Barge Loading.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAIsopentane / Isopar-E Project
Detailed engineering & design (Mechanical). This project consisted of revising existing piping adding block valves and control valves to change the routing of the existing piping system.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAFlare Vent Line
Detailed engineering & design (Mechanical & structural). This project consisted of the piping design of a new flare vent line to replace the existing vent system. The existing piping rack system was modified to support the new line.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAPhase 2 Engineering
Phase 2 Engineering
Category: Redesign-RetrofitLocation: USAOn-site LPVCM
On-site LPVCM
Category: Redesign-RetrofitMarket: ChemicalLocation: USA336SU12A & 12B Inst. Mod. And Upgrade Request
Designed upgrade Instrumentation for Sump Level Controls.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAAlky Propane Shutdown Project
Detailed engineering/design (Mechanical, structural & I&E). Project added new vent lines into their existing vent system with Hot Taps. Structural department add a new extension to the existing platform on the top of the existing structure.
Category: Redesign-RetrofitMarket: RefineryLocation: USAHot Tap Toluene Unit Make Line
Designed Hot Tap installation for rerouting piping.
Category: Redesign-RetrofitMarket: ChemicalLocation: USARelocate 50# Steam to Reactors Flow
Designed Piping to relocate 50# Steam Flow.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAInstall a DP Type Level Device on C101 Lube Oil System
Designed installation of DP Type Level Device on C101 Lube Oil System. Including new Nozzle Oil Tank.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA2 New Temp Transmitters
Designed Piping and Instrumentation to install 2 new Temperature Transmitters.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAImprove 70H401 Superheat Section Reliability (DeSuperHeater)
Designed Piping for installtion of DesuperHeater, Spec'd DesuperHeater.
Category: Redesign-RetrofitMarket: ChemicalLocation: USATemporary Crude AN Receiving
Design temporary piping for unloading Crude AN.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAT670 Emissions
Detailed engineering and design (Mechanical). Project consisted of re-routing existing piping and PSV's for the existing flare/vent system.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAMove P805-3 to P805-2 Location to Facilitate Barge Loading from T804
Designed piping for relocation of Pump.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAInstall Bridge at "G" street and Dock Road
Designed Bridge for Ditch crossing.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAInstall PCV's on Equistar's Light Product storage tanks
Designed Piping to install PCVs on N2 Piping to Tanks.
Category: Redesign-RetrofitMarket: ChemicalLocation: USADrainage Study
Studied existing drainage system @ Lab. The storm water was not draining properly; water standing in parking lot. For new catch basins and tied the storm sewer directly to city storm sewer system.
Category: Redesign-RetrofitMarket: RefineryLocation: USAFeasibility engineering for underground piping project
Provided scoping and material labor estimate for client's yearly budget. Preliminary routings and costs were developed on this project.
Category: Redesign-RetrofitMarket: RefineryLocation: USAConstruct Elevated Platform in Pipe Rack South of 70C101
Designed Platform for Pipe Rack.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAInstall platform around T16
Designed access platform around T16 for Clean Out Nozzles.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAInstall Piping to Pump from 320P805-2 around 320P805-3
Designed Piping for Product Transfer Pump.
Category: Redesign-RetrofitMarket: ChemicalLocation: USADesign & Install Seal Pot w/Alarm to Control House from 320P976-2
Designed Piping and Seal Pot w/Alarm to Control House.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAMiddle Rack Secondary Containment-Preliminary Engineering & Estimate
TIC Estimate and Front End Engineering.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA70T105 Explosion Hatches
Designed Explosion Hatches for Tank.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAPO Rail Unloading at U1
R/C unloading rack expansion. Structural steel modifications with new gangway and cage. Piping modifications to include new control station, Micro motion flow meter and loading arm for Propylene Oxide.
Category: Redesign-RetrofitMarket: ChemicalLocation: USASet up 70E202-3 as a Spare 70E503
Reworked piping so that existing exchanger could be used as spare for another service.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAHCL Replacement
Demo existing HCL system and replace with H2504 Tote System.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAHot stopple of 350T1-2 connecting line
Designed installation of cross stopple for installation of piping and valves for tank.
Category: Redesign-RetrofitMarket: ChemicalLocation: USACogen Desecrator Tank Replacement
Structural steel modifications for vessel replacement. R/R corroded steel with new.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA320T823-3 Piping Revisions
Designed Piping modifications on tank to install N2 Blanket..
Category: Redesign-RetrofitMarket: ChemicalLocation: USACL2 Suction Chiller
Chlorine chiller expansion pot. Cold service piping and stress analysis. Four new pumps and control stations.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAP1 Sugar Feed to D-101
Structural steel modification for pneumatic sugar feed to reactor to sustain piping and bag house on top of reactor.
Category: Redesign-RetrofitMarket: ChemicalLocation: USALPVCM-Railcar Fall Protection
Update railcar gangways, safety cages and for loading VCM, Chlorine and R/C cleanout. 8 spots.
Category: Redesign-RetrofitMarket: ChemicalLocation: USARe-route 10 PSV's back to 320T971-1
Designed piping to re-route 10 PSV's outlet piping back to 320T971-1.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAAcid Purge
TIC Estimate forAcid Purge Revisions. Project Canceled.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAOn-site LPVCM
On-site LPVCM
Category: Redesign-RetrofitMarket: ChemicalLocation: USAWaste Water Compliance Project
Designed Slab for Instrumentation
Category: Redesign-RetrofitMarket: ChemicalLocation: USAHRVOC
Emission control mechanical detail design project. New control station, piping, revisions.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAAbsorber Off Gas Revisions
Design Double Block and Bleed by adding 30 inch butterfly valve
Category: Redesign-RetrofitMarket: ChemicalLocation: USATET Pump Controls Upgrade
Category: Redesign-RetrofitMarket: RefineryLocation: USAChange 55PCV108-1/2/3 to Butterfly Control Valves
Design replacement piping to change control valves to butterfly type valves.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAMP Boiler Feed water Pump Recirculation Line
Redesign piping for boiler feed water pumps for better work clearances.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA70T204 Settling Revisions
Design new overflow system for Settling Tank.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAFee Support for R&D Relocation
Fee Support for R&D Relocation
Category: Redesign-RetrofitMarket: ChemicalLocation: USAHRVOC Monitoring Compliance Project
Designed Nozzle connections on Flares for Flow Instrumentation Installation and design barricades for Instrument Boxes.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAModify Docks 2 & 3 Flush Headers & Sample Pts
Designed new piping on dock 3 to make sure there is not cross contamination of Products.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAAdd Zeolite Waterline to 83S14
Run new 2" stainless steel pipe and change out part of zeolite water pipe.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAAdd Additional Venting Per Equistar to 320T92
Designed additional venting, including Nozzle and Conservation Vent.
Category: Redesign-RetrofitMarket: ChemicalLocation: USACT3 Piping & Electrical Replacement
Piping and electrical replacement.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAHPM BLDGS A
Detailed civil design of access roadway to new plant facility.
Category: Redesign-RetrofitLocation: USAHPM Building Compliance Phase II
Engineering and design for Hazardous Process Materials storage facilities. Work included code compliance studies, architectural design, civil and structural design, instrument and electrical design and piping design.
Category: Redesign-RetrofitLocation: USAInstall Redundant XV's on 70K305-1 Drain Line
Designed installation of redundant Control Valves on the 70K305-1 drain line.
Category: Redesign-RetrofitMarket: ChemicalLocation: USARevise Circulating Water Purge Piping
Revised circulating water purge piping.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAPSV Header at VCM Tank Farm
VCM Sphere tank farm header thermal expansion PSV's and expansion pot. New design. Foundations and piping.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAFormalin Tank Hi Level Improvement
Install new 2"-150 nozzles in existing tank manways. Install new Hi level probes and remove existing Hi level probes and install blind flanges as requied.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAUpgrade SO2 Flow Meters
Upgraded SO2 flow meters. Redesigned piping for new meters.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAD308 Bottoms to D203 Bottoms
Piping project canceled
Category: Redesign-RetrofitMarket: ChemicalLocation: USATK Drum Breaker/Conveyor System
Preliminary mechanical and civil design for a solids flake breaker installation.
Category: Redesign-RetrofitLocation: USAMAPL Pipeline Expansion
Detailed engineering and design (all disciplines) to increase capacity of gasoline pipeline. Scope included specification for cleaning and hydrotesting pipeline.
Category: Redesign-RetrofitMarket: RefineryLocation: USAEnclosure for R-1002A&B Design
Enclosure on top of existing reactor structure. Add. steel structure framing, building roof & metal siding were added on top of existing reactor. For prevention of outside moisture reacting w/catalyst during installation of new catalyst in the reactor.
Category: Redesign-RetrofitMarket: ChemicalLocation: USALPG Tank Overfilling and Atmospheric Relief Project
Mechanical, electrical, civil, and instrumentation front end engineering, to implement instrumentation for prevention of tank overfilling.
Category: Redesign-RetrofitMarket: RefineryLocation: USATails Dryer Potable Water System
Process detail design to perform hydraulic study, tank sizing, pump sizing, safety showers to comply with OSHA specifications.
Category: Redesign-RetrofitLocation: USAMHF #3 and #4 Blowers Clean Air Suction Duct Project
Mechanically redesign of duct system and platforms resulting in effective filtering of process dust.
Category: Redesign-RetrofitLocation: USADSM Screen Relocation
Analyzed a four story structure and used doppler radar to anaylze the foundations and certify capacity for handling additional weight associated with ball mill process.
Category: Redesign-RetrofitLocation: USAContaminated Water Storage Tank A Replacement
Mechanical, civil, structual, instrument, and electrical detailed design for replacement of storage tank.
Category: Redesign-RetrofitMarket: Natural GasLocation: USAJundia Gas Compression Project
Balance of plant mechanical and structural detailed design for the relocation of an existing gas compression facility. Facility includes four gas compressors and associated equipment.
Category: Redesign-RetrofitMarket: Natural GasLocation: GlobalFlare Replacement IMPR Phase 2 (Second part of 7010)
Detailed Design and Field Follow-up of Installation of Piping for Flare Replacement
Category: Redesign-RetrofitMarket: ChemicalLocation: USAFabrication Drawings Vertical Riser
Category: Redesign-RetrofitMarket: ChemicalLocation: USABurner Management System Upgrade
Piping Revisions for Upgrade of Furnace Burner Management System
Category: Redesign-RetrofitMarket: ChemicalLocation: USACAT Charge Line Project
Piping detailed design
Category: Redesign-RetrofitMarket: RefineryLocation: USAEmergency Muster Reader Project
Instrumentation detailed design
Category: Redesign-RetrofitMarket: RefineryLocation: USATank Replacement
Category: Redesign-RetrofitMarket: ChemicalLocation: USABuild Road Grating Crossing to Cover Exposed Piping at Dock Road
Replace Road Crossing Over Piping
Category: Redesign-RetrofitMarket: ChemicalLocation: USAUpgrade Ven System on 320T233-1
Replace N2 System on Tank
Category: Redesign-RetrofitMarket: ChemicalLocation: USAEmergency Muster Reader Project
Intrumentation detailed design
Category: Redesign-RetrofitMarket: RefineryLocation: USAUpgrade Slurry Manifold
Piping detailed design
Category: Redesign-RetrofitMarket: RefineryLocation: USASubstation Upgrades #2
Piping detailed design
Category: Redesign-RetrofitMarket: RefineryLocation: USASolvent Sewer Integrity Project
Piping detailed design
Category: Redesign-RetrofitMarket: RefineryLocation: USATars B Tank Replacement
Category: Redesign-RetrofitMarket: ChemicalLocation: USASubstation Upgrades
Piping detailed design
Category: Redesign-RetrofitMarket: RefineryLocation: USAFlare Pilot Gas Lines - Part 1
Replace existing Piping
Category: Redesign-RetrofitMarket: ChemicalLocation: USAProvox Upgrade
Upgrade Provox System
Category: Redesign-RetrofitMarket: ChemicalLocation: USARoof Modifications
Category: Redesign-RetrofitMarket: ChemicalLocation: USAUpgrade HCN Low Flow
Upgraded HCN flow meters. Redesigned piping for new meters.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAKOH Storage Cap Increase
Detailed engineering and design for a potassium hydroxide storage tank, including pumps, piping, civil, instrument, and electrical.
Category: Redesign-RetrofitMarket: RefineryLocation: USA55R4 HCN Analyzer
Designed piping and instrumentation for installation of HCN analyzer.
Category: Redesign-RetrofitMarket: ChemicalLocation: USATank Farm Instrument Upgrade
Designed upgrades for Level Control Instrumentation.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAHRVOC Analytical Test
TIC Estimates and design of installation of flanged outlets on flare stacks for Flow Instruments.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAAbsorber Off Gas Vent Revisions
Designed Double Block and Bleed by adding 30 inch butterfly valve
Category: Redesign-RetrofitMarket: ChemicalLocation: USAFlare Knockout Pot Revisions
Designed replacement can on Flare.
Category: Redesign-RetrofitMarket: ChemicalLocation: USATSS Solids Analyzers
Modified piping and added instrumentation for analyzing process wastes.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAPiping Modification on Propylene Pumps
Modified piping configuration to streamline operations.
Category: Redesign-RetrofitMarket: ChemicalLocation: USACWD Diversion Valves
Revision of concrete outfall dam to install slide gate valves, replacement of diversion gate valves, and removal of catwalk.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA55H2 Burner Management Upgrade
TIC Estimate for upgrading Piping and Instrumentation Controls of Heater Burner System.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA55H2 Burner Management Upgrade
Design upgrade for Piping and Instrumentation Controls of Heater Burner System, including Gas Flow Calculations..
Category: Redesign-RetrofitMarket: ChemicalLocation: USAPotable Water Distribution Header Study
TIC Estimate for replacement of plant potable water supply system.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAOverhead Cyanide Pipe Support
Design repair of damaged Overhead Cyanide Pipe Support.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAC St Steam Lines Modification
TIC Estimates for redesigning the Plant 450# Steam Supply System. Installed thermowells for Temperature Instrumentation and Tie-ins for Future Piping.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAPropylene Area Tie Points
Cleaned up excess piping not needed with miscellaneous piping modifications.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAInstall and Test Thermo-Degasser for 30C2 Oil System
TIC Estimate for Installation and Testing of Portable Thermo-Degasser for 30C2 Oil System.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAInstall and Test Thermo Degasser for 30C2 Oil System
Designed piping for installation of Portable Thermo-Degasser for 30C2 oil System. Help with Testing Procedures.
Category: Redesign-RetrofitMarket: ChemicalLocation: USANew T 315 CVO Assembly
Modified piping atop of tank to keep vent system from polymerizing.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA57T5 Vent to 55H2 Furnace
Addition re-pulls of bad cable, redesign using interposing relays because of induced voltages.
Category: Redesign-RetrofitMarket: ChemicalLocation: USARoute Sour Water Drains From U11 & U14 to U28
Mechanical, electrical, civil, and instrumentation detailed design for piping collection system to send sour water to a production unit instead of oily water sewer.
Category: Redesign-RetrofitMarket: RefineryLocation: USAU68 Diesel Dye Injection System
Mechanical, electrical, civil, and instrumentation detailed design for upgrade for truck loading facility with a dye injection system.
Category: Redesign-RetrofitMarket: RefineryLocation: USAU120 Main Gate Security Bldg Replacement
Mechanical, electrical, civil, and instrumentation detailed design for replacing existing main gate security building with explosion resistant modular building.
Category: Redesign-RetrofitMarket: RefineryLocation: USAInstall EIV's on TK-39 & 423
Installed emergency isolation valves for tank farm.
Category: Redesign-RetrofitMarket: RefineryLocation: USA
Previous page: FEED/FEL/Scope Development