Project Portfolio
Review our Project Portfolio for proof of Chemic’s years of experience. If you have questions about any of the information shown here, please contact us.
To see a map of locations that Chemic has worked in click here.
55R4 HCN Analyzer
Designed piping and instrumentation for installation of HCN analyzer.
Category: Redesign-RetrofitMarket: ChemicalUpgrade HCN Low Flow
Upgraded HCN flow meters. Redesigned piping for new meters.
Category: Redesign-RetrofitMarket: ChemicalReplace Raff II Barge Loading Pipeline
Replacement of existing piping with line size increase from 8 inch to 10 inch on new piping.
Category: MaintenanceMarket: Chemical1710/DPVCM V6004B Support Calcs-A
Sphere leg support calculations due to corrosion issues. Repair design developed.
Category: On-site AssistanceMarket: ChemicalHIMO One Pass 1.5
Designed additional tee supports based on pipe stress calculations.
Category: Redesign-RetrofitMarket: ChemicalUpgrade Heater 02 Analyzers
Disigned Upgrade for Heater 02 Analyzers, including Nozzle Additions to Heaters and Platform for Access.
Category: Redesign-RetrofitMarket: ChemicalBenzene Line Upgrade to Lab
Designed Piping upgrade for Benzene Line.
Category: MaintenanceMarket: Chemical40E1 Exchanger Replacement
40E1 Exchanger replacement, like for like.
Category: Redesign-RetrofitMarket: ChemicalT48 Dike Area Elevation
Surveyed T48 inside Dike Area elevations and provided Plan Drawing w/Elevations. TIC Estimate for raising inside elevation to take area out of "Confined Space" Requirements.
Category: Redesign-RetrofitMarket: ChemicalFormalin 83R1 Redesign Screen and Support Grating
Formalin 83R1 Redesign Screen and Support Grating
Category: Redesign-RetrofitMarket: ChemicalInstall Dip Tube LI38 on T56-2
Designed Nozzle installation for Dip Tube LI38 on T56-2.
Category: Redesign-RetrofitMarket: ChemicalVerify Emergency Relief System
Verify emergency relief systems for vessels, make reccomendations as required to meet Standards.
Category: MaintenanceMarket: ChemicalDe-Superheating Water Let Down
Designed Piping for installation of de-superheating water letdown valve.
Category: Redesign-RetrofitMarket: Chemical1668/DPVCM On-site A
1668/DPVCM On-site A
Category: Minor ExpansionMarket: Chemical55T16 Clean Out Ports
Designed Clean Out Nozzles on cone bottom of Tank.
Category: Redesign-RetrofitMarket: Chemical51D3 Feed Tank 51T14 Replace
TIC Estimate for Feed Tank Replacement.
Category: Redesign-RetrofitMarket: Chemical70R101-2 Install Sample Valve
Installed sample valves at cyclone steam quench connections.
Category: MaintenanceMarket: ChemicalPull 70XV411
Pulled 70XV411 and replaced with Spool Piece, 84" Diameter Piping.
Category: MaintenanceMarket: ChemicalDistribution Safety Showers
TIC Estimate for the addition of three new Safety Showers.
Category: MaintenanceMarket: ChemicalReplace Nitro Purge #24
Replaced nitrogen purge with a fuel gas purge.
Category: MaintenanceMarket: ChemicalOn-Site Services
N/A On-site
Category: On-site AssistanceMarket: ChemicalOn-Site Services
N/A On-site
Category: On-site AssistanceMarket: ChemicalOn-Site Services
N/A On-site
Category: On-site AssistanceMarket: ChemicalOn-Site Services
N/A On-site
Category: On-site AssistanceMarket: ChemicalTruck Rack Safety Upgrades
Designed Tie Off System for Loaders AT Truck Rack.
Category: Redesign-RetrofitMarket: Chemical320T302 Vent Additions and Nozzle, Piping Additions
Designed 320T302 Vent Additions, including Nozzle addition and Piping revisions.
Category: Redesign-RetrofitMarket: ChemicalShutdown Interlock Testing
Provided Shutdown Interlock Testing and Documentation.
Category: MaintenanceMarket: Chemical1710/LPVCM Loop Reactor PH1
LTC Reactor replacement with like kind. Total station and conventional field verification. Vendor drawing review. Vessel calculations review. Piping modifications. Field construction follow-up.
Category: Redesign-RetrofitMarket: ChemicalOnsite Piping Designer
Onsite Piping Designer
Category: MaintenanceMarket: ChemicalRelief Valve Change Recommendation for Both 320T247-1&2
Designed Relief Valve Changeout for 320T247-1&2, including inlet and outlet piping.
Category: MaintenanceMarket: ChemicalRepair Bank Erosion Docks
Designed repairs to Docks Bank to prevent Erosion.
Category: MaintenanceMarket: ChemicalResize the Lube Oil Coolers on C504-1&2
Resized the Lube Oil Coolers on C504-1&2
Category: Redesign-RetrofitMarket: ChemicalRedundant Temp. Transmit to 321TIC113 & 321TI112 for control XV114
Designed Redundant Temp. Transmitter System to 321TIC113 & 321TI112 for control of XV114.
Category: Redesign-RetrofitMarket: ChemicalInstall Tie Header at Dock 3 for Toluene Barge Loading
Designed Tie-in on Header Dock 3 for Toluene Barge Loading.
Category: Redesign-RetrofitMarket: ChemicalIsopentane / Isopar-E Project
Detailed engineering & design (Mechanical). This project consisted of revising existing piping adding block valves and control valves to change the routing of the existing piping system.
Category: Redesign-RetrofitMarket: ChemicalLPVCM-Onsite
LPVCM-Onsite
Category: On-site AssistanceMarket: ChemicalFlare Vent Line
Detailed engineering & design (Mechanical & structural). This project consisted of the piping design of a new flare vent line to replace the existing vent system. The existing piping rack system was modified to support the new line.
Category: Redesign-RetrofitMarket: ChemicalOn-site LPVCM
On-site LPVCM
Category: Redesign-RetrofitMarket: ChemicalIWPF Tank Sludge Cleaning
Process Evalution. TIC Estimate for Solids Removalfrom Tank.
Category: MaintenanceMarket: ChemicalEDC Meter Stations
EDC piping pig launchers and receivers, Micro motion flow meters.
Category: On-site AssistanceMarket: Chemical336SU12A & 12B Inst. Mod. And Upgrade Request
Designed upgrade Instrumentation for Sump Level Controls.
Category: Redesign-RetrofitMarket: ChemicalInstall a DP Type Level Device on C101 Lube Oil System
Designed installation of DP Type Level Device on C101 Lube Oil System. Including new Nozzle Oil Tank.
Category: Redesign-RetrofitMarket: ChemicalHot Tap Toluene Unit Make Line
Designed Hot Tap installation for rerouting piping.
Category: Redesign-RetrofitMarket: ChemicalRelocate 50# Steam to Reactors Flow
Designed Piping to relocate 50# Steam Flow.
Category: Redesign-RetrofitMarket: Chemical2 New Temp Transmitters
Designed Piping and Instrumentation to install 2 new Temperature Transmitters.
Category: Redesign-RetrofitMarket: ChemicalImprove 70H401 Superheat Section Reliability (DeSuperHeater)
Designed Piping for installtion of DesuperHeater, Spec'd DesuperHeater.
Category: Redesign-RetrofitMarket: ChemicalAluminum Transfer Facility Appraisal
Market: ChemicalTemporary Crude AN Receiving
Design temporary piping for unloading Crude AN.
Category: Redesign-RetrofitMarket: ChemicalLandfill Cell #5
Calculations for Fill Area if Access Ramp relocated.
Category: MaintenanceMarket: ChemicalUpdate EFD'S for 350 Area
Perform EFD Walkdowns and update all files to CAD.
Category: MaintenanceMarket: ChemicalT670 Emissions
Detailed engineering and design (Mechanical). Project consisted of re-routing existing piping and PSV's for the existing flare/vent system.
Category: Redesign-RetrofitMarket: ChemicalMove P805-3 to P805-2 Location to Facilitate Barge Loading from T804
Designed piping for relocation of Pump.
Category: Redesign-RetrofitMarket: ChemicalPipe Ditch/Overhead Rack Survey & Identification
Survey and document Piping in Ditch/Overhead Racks for Maintenance purposes.
Category: MaintenanceMarket: ChemicalDPVCM-Ethylene / Propylene Interchangers
New exchanger steel modifications for additional loading.
Category: On-site AssistanceMarket: ChemicalP1 TF and R/C Pipe Rack Mod.
Pipe rack new level extension for additional piping. Foundation and steel calculations with detail design. +/-1000LF.
Category: On-site AssistanceMarket: ChemicalReactor E-6101 Replacement
EDC Reactor replacement structural steel modifications. Concrete structure and steel structure.
Category: Minor ExpansionMarket: ChemicalInstall PCV's on Equistar's Light Product storage tanks
Designed Piping to install PCVs on N2 Piping to Tanks.
Category: Redesign-RetrofitMarket: ChemicalInstall Bridge at "G" street and Dock Road
Designed Bridge for Ditch crossing.
Category: Redesign-RetrofitMarket: ChemicalBridge #10 Repair
Designed repairs for Bridge Columns and Footers.
Category: MaintenanceMarket: ChemicalReplace Sections of NESHAP Piping pre MTS Recommendations
Designed replacement piping for corroded piping, like for like.
Category: MaintenanceMarket: ChemicalConstruct Elevated Platform in Pipe Rack South of 70C101
Designed Platform for Pipe Rack.
Category: Redesign-RetrofitMarket: ChemicalDike Wall Erosion Repairs
Designed repair for leak in concrete Dile Wall.
Category: MaintenanceMarket: ChemicalOn-site drawing scans
On-site drawing scans
Category: Minor ExpansionMarket: ChemicalRepair Damageg Structural & Piping at 70XV114-2 (S/D 104)
Designed repairs for damaged structural steel and piping.
Category: MaintenanceMarket: Chemical70C101 Air Compress System Repairs, 24" Steam Line to C101
Stress Calculations on 24" Steam Line, designed Stop & Support to prevent damage..
Category: MaintenanceMarket: ChemicalInstall platform around T16
Designed access platform around T16 for Clean Out Nozzles.
Category: Redesign-RetrofitMarket: ChemicalDesign & Install Seal Pot w/Alarm to Control House from 320P976-2
Designed Piping and Seal Pot w/Alarm to Control House.
Category: Redesign-RetrofitMarket: ChemicalInstall Piping to Pump from 320P805-2 around 320P805-3
Designed Piping for Product Transfer Pump.
Category: Redesign-RetrofitMarket: ChemicalMiddle Rack Secondary Containment-Preliminary Engineering & Estimate
TIC Estimate and Front End Engineering.
Category: Redesign-RetrofitMarket: ChemicalReplace Pilot Ignition System on Reactor Air Heater
Replaced pilot ignition system on reactor air heaters.
Category: MaintenanceMarket: ChemicalDocument/Redline/Change 24VDC Power Distribution
Updated Unit Documentation on 24 Volt Power System
Category: MaintenanceMarket: Chemical70T105 Explosion Hatches
Designed Explosion Hatches for Tank.
Category: Redesign-RetrofitMarket: ChemicalPO Rail Unloading at U1
R/C unloading rack expansion. Structural steel modifications with new gangway and cage. Piping modifications to include new control station, Micro motion flow meter and loading arm for Propylene Oxide.
Category: Redesign-RetrofitMarket: ChemicalHCL Replacement
Demo existing HCL system and replace with H2504 Tote System.
Category: Redesign-RetrofitMarket: ChemicalSet up 70E202-3 as a Spare 70E503
Reworked piping so that existing exchanger could be used as spare for another service.
Category: Redesign-RetrofitMarket: ChemicalMarch 2006 HPDA Outage Work
Designed Piping to replace 4 existing instruments with upgraded instruments.
Category: MaintenanceMarket: ChemicalRepair Nat Gas Line (E & 7th St. Area)
Designed repairs for natural gas line (E & 7th street) area.
Category: MaintenanceMarket: ChemicalPlatform for portable water filters
TIC Estimate and Design for Access Platform.
Category: MaintenanceMarket: ChemicalHot stopple of 350T1-2 connecting line
Designed installation of cross stopple for installation of piping and valves for tank.
Category: Redesign-RetrofitMarket: ChemicalCost Estimate for 320T161's Radar Access Platform
TIC Estimate for 320T161's Radar Access Platform.
Category: MaintenanceMarket: ChemicalCogen Desecrator Tank Replacement
Structural steel modifications for vessel replacement. R/R corroded steel with new.
Category: Redesign-RetrofitMarket: Chemical320T823-3 Piping Revisions
Designed Piping modifications on tank to install N2 Blanket..
Category: Redesign-RetrofitMarket: ChemicalReplace Sump Line Between
Designed replacement of Sump Line.
Category: MaintenanceMarket: ChemicalCL2 Suction Chiller
Chlorine chiller expansion pot. Cold service piping and stress analysis. Four new pumps and control stations.
Category: Redesign-RetrofitMarket: ChemicalP1 Sugar Feed to D-101
Structural steel modification for pneumatic sugar feed to reactor to sustain piping and bag house on top of reactor.
Category: Redesign-RetrofitMarket: ChemicalRailcar Fall Protection
Update railcar gangways, safety cages and for loading Acid, Chlorine and decontamination. 6 spots.
Category: Minor ExpansionMarket: ChemicalLPVCM-Railcar Fall Protection
Update railcar gangways, safety cages and for loading VCM, Chlorine and R/C cleanout. 8 spots.
Category: Redesign-RetrofitMarket: ChemicalRe-route 10 PSV's back to 320T971-1
Designed piping to re-route 10 PSV's outlet piping back to 320T971-1.
Category: Redesign-RetrofitMarket: ChemicalOn-site LPVCM
On-site LPVCM
Category: Redesign-RetrofitMarket: Chemical450# Steam Line Sleeper Repair "F" Street
Designed in Structural repair for broken Concrete Sleeper.
Category: MaintenanceMarket: ChemicalAcid Purge
TIC Estimate forAcid Purge Revisions. Project Canceled.
Category: Redesign-RetrofitMarket: ChemicalReplace Domestic Sewer Line from S2 Sump
Designed the replacement piping for the S2 Domestic Sewer Line.
Category: MaintenanceMarket: ChemicalWaste Water Compliance Project
Designed Slab for Instrumentation
Category: Redesign-RetrofitMarket: ChemicalReplace the "C" Street Domestic Sewer Line
Designed the replacement piping for the "C" Street Domestic Sewer Line.
Category: MaintenanceMarket: ChemicalHRVOC
Emission control mechanical detail design project. New control station, piping, revisions.
Category: Redesign-RetrofitMarket: ChemicalCulvert Replacement
Design Culvert replacement and area Grading for Drainage.
Category: MaintenanceMarket: ChemicalAbsorber Off Gas Revisions
Design Double Block and Bleed by adding 30 inch butterfly valve
Category: Redesign-RetrofitMarket: ChemicalInterlocks
Update and verify interlock types, service, and descriptions.
Category: MaintenanceMarket: ChemicalDPVCM Paid Verification
+/-250 P&ID as builts. Field walk down for Mechanical and I&E. CAD updates. VCM plant.
Category: Flowsheet UpdatesMarket: ChemicalConduct Expansion Loop Calc. on the 450#
Conduct expansion loop calculations on the 450# steam headers, including the conditions When Unit is exporting 700 degree steam into the header.
Category: MaintenanceMarket: ChemicalChange 55PCV108-1/2/3 to Butterfly Control Valves
Design replacement piping to change control valves to butterfly type valves.
Category: Redesign-RetrofitMarket: Chemical70T204 Settling Revisions
Design new overflow system for Settling Tank.
Category: Redesign-RetrofitMarket: ChemicalMP Boiler Feed water Pump Recirculation Line
Redesign piping for boiler feed water pumps for better work clearances.
Category: Redesign-RetrofitMarket: ChemicalFee Support for R&D Relocation
Fee Support for R&D Relocation
Category: Redesign-RetrofitMarket: ChemicalDemo Out of Service Electrical on the Docks
Cleaned up the electrical on dock 4.
Category: MaintenanceMarket: ChemicalReverse Osmosis Tank Outage
Repaired tank and nozzles, reworked piping for streamlined operations.
Category: MaintenanceMarket: ChemicalHydraulic Study of Cooling Tower System
Preformed Hydralic Study of efficiency of Unit Cooling Tower Water System.
Category: MaintenanceMarket: ChemicalInstall Cross Stopple on the 450#s STM Line
Design installation of cross stopple on the 450# steam line in "F" st. pipe ditch for Maintenance.
Category: MaintenanceMarket: ChemicalRelief Systems Phase II
PSV (relief valve) verification and documentation.
Category: MaintenanceMarket: ChemicalContractor Administrative - Chemic RSO
Client manager
Market: ChemicalHRVOC Monitoring Compliance Project
Designed Nozzle connections on Flares for Flow Instrumentation Installation and design barricades for Instrument Boxes.
Category: Redesign-RetrofitMarket: Chemical83E13 TIC Upgrade
Upgraded temperature controllers.
Category: MaintenanceMarket: ChemicalLa Porte VCM Paid Verification
+/-150 P&ID as builts. Field walk down for Mechanical and I&E. CAD updates. VCM plant.
Category: Flowsheet UpdatesMarket: ChemicalSTS Equipment Conversion
Updated EFD and Equipment Documentation after Demo of Unit for all Equipment that was saved and reused. Renumbered Equipment and Drawings as required.
Category: MaintenanceMarket: ChemicalOn-Site Services
N/A On-site
Category: On-site AssistanceMarket: ChemicalP&ID Updates
+/-100 P&ID as builts. Field walk down for Mechanical and I&E. CAD updates, PVC unit.
Category: Flowsheet UpdatesMarket: ChemicalT311 Low Water Draw and Recycle Line Revision
Modified piping to do away with low water draw on tank.
Category: MaintenanceMarket: ChemicalModify Docks 2 & 3 Flush Headers & Sample Pts
Designed new piping on dock 3 to make sure there is not cross contamination of Products.
Category: Redesign-RetrofitMarket: ChemicalOn-Site Services
N/A On-site
Category: On-site AssistanceMarket: ChemicalAdd Zeolite Waterline to 83S14
Run new 2" stainless steel pipe and change out part of zeolite water pipe.
Category: Redesign-RetrofitMarket: ChemicalInstall Flow Meters on 55E6'S
Replaced mass flow meters.
Category: MaintenanceMarket: ChemicalWHB Reliability Improvements
Upgraded gas controls.
Category: MaintenanceMarket: ChemicalT56-1 Storage Tank Repair
Converted manual drawings of Tank to CAD, including coils, plan, and elevation. Update dimensions as required.
Category: MaintenanceMarket: ChemicalAdd Additional Venting Per Equistar to 320T92
Designed additional venting, including Nozzle and Conservation Vent.
Category: Redesign-RetrofitMarket: ChemicalCT3 Piping & Electrical Replacement
Piping and electrical replacement.
Category: Redesign-RetrofitMarket: ChemicalStructural Steel, Grating & Floor Plate Replace
Structural steel, concrete and floor plate replacement.
Category: MaintenanceMarket: ChemicalRupture Disc
Market: ChemicalRepair Damaged Steam Piping
Draw EFD's of utility piping in "C" street ditch from 7th to DPO, complete turn in of all dwgs from outage.
Category: MaintenanceMarket: ChemicalSulfuric Acid Line Replacement
Replace sections of sulfuric piping in ditches per MTS recommendations.
Category: MaintenanceMarket: ChemicalPipe Stress Analysis for PTFE
Provide stress/piping flexibility for lined piping system between exchangers and check the alignment of PTFE expansion joint from overstretch and within the allowable offset.
Market: ChemicalOn-Site Services
N/A On-site
Category: On-site AssistanceMarket: ChemicalRelay Coordination Project
Review existing system, one-line diagrams, coordination plots, relay settings/test sheets. Provide short-circuit study & analysis, plot new coordination curves, provide written report w/suggested changes in order to realize improvements in the system
Market: ChemicalP4 Tank Farm Expansion
Six finished Polyols product tanks. 100k gallon with positive displacement pumps, process area manifold modifications, T/T and R/C loading facilities with loading arms. Foundations, piping, and power scope.
Market: ChemicalInstall Redundant XV's on 70K305-1 Drain Line
Designed installation of redundant Control Valves on the 70K305-1 drain line.
Category: Redesign-RetrofitMarket: ChemicalAWT Formulation Project TIC
10% total installed costs for AWT formulation project.
Category: Minor ExpansionMarket: ChemicalRevise Circulating Water Purge Piping
Revised circulating water purge piping.
Category: Redesign-RetrofitMarket: ChemicalFormalin Tank Hi Level Improvement
Install new 2"-150 nozzles in existing tank manways. Install new Hi level probes and remove existing Hi level probes and install blind flanges as requied.
Category: Redesign-RetrofitMarket: ChemicalHAZOP Related Project
Designed 30D5 filter drain revisions, 30RI vent revisions and 30T2 sulfuric acid revisions.
Category: MaintenanceMarket: ChemicalPSV Header at VCM Tank Farm
VCM Sphere tank farm header thermal expansion PSV's and expansion pot. New design. Foundations and piping.
Market: ChemicalE&C Pkg. Witte Class
Detailed design for installation classifer.
Category: Minor ExpansionMarket: ChemicalOn-Site Services
Market: ChemicalRCRA Line Repair
Replace section of pipe in ditch like for like.
Category: MaintenanceMarket: ChemicalUpgrade SO2 Flow Meters
Upgraded SO2 flow meters. Redesigned piping for new meters.
Category: Redesign-RetrofitMarket: ChemicalSouth Teal Unit # Ethylene Capping
South Teal Unit # Ethylene Capping
Category: MaintenanceMarket: ChemicalDock 3 Piping Modifications
Replaced sections of piping under Dock 3 due to heavy corrosion.
Category: Redesign-RetrofitMarket: ChemicalMCS Sump Piping Replacement
Replaced the sump piping like for like with an updated spec.
Category: MaintenanceMarket: ChemicalChlorine Transfer Line
Chlorine Transfer Line
Category: MaintenanceMarket: ChemicalOn Dock 5
Redesigned piping to remove old emission points and unused PSV's and replace with new pipe.
Category: MaintenanceMarket: ChemicalD308 Bottoms to D203 Bottoms
Piping project canceled
Category: Redesign-RetrofitMarket: Chemical51D6 TETF Alternate
Designed installation of 3" C.S. line from connection @ 51D6 to west side of unit (No pockets). A temporary scrubber will be supplied and shall connect to 3" line from 51D6
Category: MaintenanceMarket: ChemicalA300 Revisions
Designed new piping from Unit to 320T523 Storage Tank. Designed new piping for Benzene recycle line and new piping for a fresh benzene line.
Category: MaintenanceMarket: ChemicalC4/Truck Flare Flow Estimation (85%)
Flare calculations for air permit application.
Category: MaintenanceMarket: ChemicalBurner Assembly
Provide detail engineering design and fabrication drawings on special burner tip.
Market: ChemicalEnclosure for R-1002A&B Design
Enclosure on top of existing reactor structure. Add. steel structure framing, building roof & metal siding were added on top of existing reactor. For prevention of outside moisture reacting w/catalyst during installation of new catalyst in the reactor.
Market: Chemical384 Interlock Reviews - Air Comp
Investigation of the existing interlocks in the new unit & developing a database with the end goal being the verification & documentation of all interlocks. SIS related items
Category: On-site AssistanceMarket: ChemicalHours: 500+369 Interlock Reviews - Super Turbine
Investigation of the existing interlocks in the new unit & developing a database with the end goal being the verification & documentation of all interlocks. SIS related items
Category: On-site AssistanceMarket: Chemical350 Interlock Reviews - Boilers
Investigation of the existing interlocks in the new unit & developing a database with the end goal being the verification & documentation of all interlocks. SIS related items
Category: On-site AssistanceMarket: ChemicalPortable Water Line
TIC Estimates and Front End Engineering for replacement of Potable Water Piping.
Category: MaintenanceMarket: ChemicalTank Farm Instrument Upgrade
Designed upgrades for Level Control Instrumentation.
Category: Redesign-RetrofitMarket: ChemicalHRVOC Analytical Test
TIC Estimates and design of installation of flanged outlets on flare stacks for Flow Instruments.
Category: Redesign-RetrofitMarket: Chemical40R1-R2 Raw Materials Delivery
Design piping revisions for 40R1/R2 raw material delivery enhancement.
Category: MaintenanceMarket: ChemicalAbsorber Off Gas Vent Revisions
Designed Double Block and Bleed by adding 30 inch butterfly valve
Category: Redesign-RetrofitMarket: ChemicalFlare Knockout Pot Revisions
Designed replacement can on Flare.
Category: Redesign-RetrofitMarket: Chemical57T4 Reflux Tank Replacement
Designed additional steam tracing supply condensate return for vessel, Update P&ID's.
Category: MaintenanceMarket: ChemicalInstall Sonar Device on 57T20
Install sonar device, including wire pulling from MCC and new junction box.
Category: MaintenanceMarket: ChemicalBoiler Fuel Gas Drawing
Replaced expansion loop in pipe ditch.
Category: MaintenanceMarket: ChemicalDemo NH3
Demo existing piping and reroute to remove existing ammonia drains from the "clean water" drains.
Category: DemolitionMarket: ChemicalTSS Solids Analyzers
Modified piping and added instrumentation for analyzing process wastes.
Category: Redesign-RetrofitMarket: ChemicalReplace Line II 40E16& 40E32 Heat Exchangers
Replaced Exchangers like for like.
Category: MaintenanceMarket: ChemicalContractor Safety Orientations - Chemic
Safety orientations.
Market: Chemical150# Steam Line Repairs
Replaced damaged Steam Piping, performed Stress Calculations as required.
Category: MaintenanceMarket: ChemicalPiping Modification on Propylene Pumps
Modified piping configuration to streamline operations.
Category: Redesign-RetrofitMarket: ChemicalReplace Plant Railroad Bridge
Acquired Vendors for Railroad Bridge Replacement. Helped w/TIC Estimate.
Category: MaintenanceMarket: ChemicalReplace N. / S. Clean Water Ditch Diversion Valves
TIC Estimate and Front End Engineering.
Category: MaintenanceMarket: ChemicalCWD Diversion Valves
Revision of concrete outfall dam to install slide gate valves, replacement of diversion gate valves, and removal of catwalk.
Category: Redesign-RetrofitMarket: ChemicalRepair Bank Erosion
Design repairs for bank erosion including Gunite installation on Banks, removal of sediment in ditch, and reworking drainage channels.
Category: MaintenanceMarket: ChemicalUpdate EFDs & Loop Drawings
Update formalin EFD's and loop drawings.
Category: MaintenanceMarket: Chemical55H2 Burner Management Upgrade
TIC Estimate for upgrading Piping and Instrumentation Controls of Heater Burner System.
Category: Redesign-RetrofitMarket: Chemical55H2 Burner Management Upgrade
Design upgrade for Piping and Instrumentation Controls of Heater Burner System, including Gas Flow Calculations..
Category: Redesign-RetrofitMarket: ChemicalPotable Water Distribution Header Study
TIC Estimate for replacement of plant potable water supply system.
Category: Redesign-RetrofitMarket: ChemicalOverhead Cyanide Pipe Support
Design repair of damaged Overhead Cyanide Pipe Support.
Category: Redesign-RetrofitMarket: ChemicalRCRA Tank Cert 336T1&2 and 336T2-1
PE Certification for tanks used in RCRA service.
Category: MaintenanceMarket: ChemicalC St Steam Lines Modification
TIC Estimates for redesigning the Plant 450# Steam Supply System. Installed thermowells for Temperature Instrumentation and Tie-ins for Future Piping.
Category: Redesign-RetrofitMarket: Chemical377N3 Agitator
Replace gear box and agitator.
Category: MaintenanceMarket: ChemicalPropylene Area Tie Points
Cleaned up excess piping not needed with miscellaneous piping modifications.
Category: Redesign-RetrofitMarket: ChemicalInstall and Test Thermo-Degasser for 30C2 Oil System
TIC Estimate for Installation and Testing of Portable Thermo-Degasser for 30C2 Oil System.
Category: Redesign-RetrofitMarket: ChemicalInstall and Test Thermo Degasser for 30C2 Oil System
Designed piping for installation of Portable Thermo-Degasser for 30C2 oil System. Help with Testing Procedures.
Category: Redesign-RetrofitMarket: Chemical1710/LPVCM "C" Hot Quench Column A
Brick lined reactor replacement with like kind. Total station survey. Vendor fabrication drawing review. Oxyhdrochlorination Hot Quench column. 12'-3" dia. X 37'-10" T/T
Category: Minor ExpansionMarket: ChemicalInstall Mud Boot Cross Stopple on the 50# Steam Line
Designed installation of cross stopple in mud boot in the 50# Steam Line for Maintenance.
Category: MaintenanceMarket: ChemicalNew T 315 CVO Assembly
Modified piping atop of tank to keep vent system from polymerizing.
Category: Redesign-RetrofitMarket: Chemical57T5 Vent to 55H2 Furnace
Addition re-pulls of bad cable, redesign using interposing relays because of induced voltages.
Category: Redesign-RetrofitMarket: ChemicalOn-site DPVCM
On-site DPVCM
Category: On-site AssistanceMarket: Chemical