Project Portfolio
Review our Project Portfolio for proof of Chemic’s years of experience. If you have questions about any of the information shown here, please contact us.
To see a map of locations that Chemic has worked in click here.
1710/DPVCM V6004B Support Calcs-A
Sphere leg support calculations due to corrosion issues. Repair design developed.
Category: On-site AssistanceMarket: ChemicalLocation: USAHIMO One Pass 1.5
Designed additional tee supports based on pipe stress calculations.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAUpgrade Heater 02 Analyzers
Disigned Upgrade for Heater 02 Analyzers, including Nozzle Additions to Heaters and Platform for Access.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA40E1 Exchanger Replacement
40E1 Exchanger replacement, like for like.
Category: Redesign-RetrofitMarket: ChemicalLocation: USABenzene Line Upgrade to Lab
Designed Piping upgrade for Benzene Line.
Category: MaintenanceMarket: ChemicalLocation: USAT48 Dike Area Elevation
Surveyed T48 inside Dike Area elevations and provided Plan Drawing w/Elevations. TIC Estimate for raising inside elevation to take area out of "Confined Space" Requirements.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAFormalin 83R1 Redesign Screen and Support Grating
Formalin 83R1 Redesign Screen and Support Grating
Category: Redesign-RetrofitMarket: ChemicalLocation: USAInstall Dip Tube LI38 on T56-2
Designed Nozzle installation for Dip Tube LI38 on T56-2.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAVerify Emergency Relief System
Verify emergency relief systems for vessels, make reccomendations as required to meet Standards.
Category: MaintenanceMarket: ChemicalLocation: USADe-Superheating Water Let Down
Designed Piping for installation of de-superheating water letdown valve.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA55T16 Clean Out Ports
Designed Clean Out Nozzles on cone bottom of Tank.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA1668/DPVCM On-site A
1668/DPVCM On-site A
Category: Minor ExpansionMarket: ChemicalLocation: USA51D3 Feed Tank 51T14 Replace
TIC Estimate for Feed Tank Replacement.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA70R101-2 Install Sample Valve
Installed sample valves at cyclone steam quench connections.
Category: MaintenanceMarket: ChemicalLocation: USAPull 70XV411
Pulled 70XV411 and replaced with Spool Piece, 84" Diameter Piping.
Category: MaintenanceMarket: ChemicalLocation: USAReplace Nitro Purge #24
Replaced nitrogen purge with a fuel gas purge.
Category: MaintenanceMarket: ChemicalLocation: USAOn-Site Services
N/A On-site
Category: On-site AssistanceMarket: ChemicalLocation: USADistribution Safety Showers
TIC Estimate for the addition of three new Safety Showers.
Category: MaintenanceMarket: ChemicalLocation: USAOn-Site Services
N/A On-site
Category: On-site AssistanceMarket: ChemicalLocation: USAOn-Site Services
N/A On-site
Category: On-site AssistanceMarket: ChemicalLocation: USAOn-Site Services
N/A On-site
Category: On-site AssistanceMarket: ChemicalLocation: USATruck Rack Safety Upgrades
Designed Tie Off System for Loaders AT Truck Rack.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA320T302 Vent Additions and Nozzle, Piping Additions
Designed 320T302 Vent Additions, including Nozzle addition and Piping revisions.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAShutdown Interlock Testing
Provided Shutdown Interlock Testing and Documentation.
Category: MaintenanceMarket: ChemicalLocation: USAOnsite Piping Designer
Onsite Piping Designer
Category: MaintenanceMarket: ChemicalLocation: USA1710/LPVCM Loop Reactor PH1
LTC Reactor replacement with like kind. Total station and conventional field verification. Vendor drawing review. Vessel calculations review. Piping modifications. Field construction follow-up.
Category: Redesign-RetrofitMarket: ChemicalLocation: USARelief Valve Change Recommendation for Both 320T247-1&2
Designed Relief Valve Changeout for 320T247-1&2, including inlet and outlet piping.
Category: MaintenanceMarket: ChemicalLocation: USARepair Bank Erosion Docks
Designed repairs to Docks Bank to prevent Erosion.
Category: MaintenanceMarket: ChemicalLocation: USARedundant Temp. Transmit to 321TIC113 & 321TI112 for control XV114
Designed Redundant Temp. Transmitter System to 321TIC113 & 321TI112 for control of XV114.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAResize the Lube Oil Coolers on C504-1&2
Resized the Lube Oil Coolers on C504-1&2
Category: Redesign-RetrofitMarket: ChemicalLocation: USAInstall Tie Header at Dock 3 for Toluene Barge Loading
Designed Tie-in on Header Dock 3 for Toluene Barge Loading.
Category: Redesign-RetrofitMarket: ChemicalLocation: USALPVCM-Onsite
LPVCM-Onsite
Category: On-site AssistanceMarket: ChemicalLocation: USAIsopentane / Isopar-E Project
Detailed engineering & design (Mechanical). This project consisted of revising existing piping adding block valves and control valves to change the routing of the existing piping system.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAFlare Vent Line
Detailed engineering & design (Mechanical & structural). This project consisted of the piping design of a new flare vent line to replace the existing vent system. The existing piping rack system was modified to support the new line.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAIWPF Tank Sludge Cleaning
Process Evalution. TIC Estimate for Solids Removalfrom Tank.
Category: MaintenanceMarket: ChemicalLocation: USAOn-site LPVCM
On-site LPVCM
Category: Redesign-RetrofitMarket: ChemicalLocation: USAEDC Meter Stations
EDC piping pig launchers and receivers, Micro motion flow meters.
Category: On-site AssistanceMarket: ChemicalLocation: USA336SU12A & 12B Inst. Mod. And Upgrade Request
Designed upgrade Instrumentation for Sump Level Controls.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAHot Tap Toluene Unit Make Line
Designed Hot Tap installation for rerouting piping.
Category: Redesign-RetrofitMarket: ChemicalLocation: USARelocate 50# Steam to Reactors Flow
Designed Piping to relocate 50# Steam Flow.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAInstall a DP Type Level Device on C101 Lube Oil System
Designed installation of DP Type Level Device on C101 Lube Oil System. Including new Nozzle Oil Tank.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA2 New Temp Transmitters
Designed Piping and Instrumentation to install 2 new Temperature Transmitters.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAImprove 70H401 Superheat Section Reliability (DeSuperHeater)
Designed Piping for installtion of DesuperHeater, Spec'd DesuperHeater.
Category: Redesign-RetrofitMarket: ChemicalLocation: USALandfill Cell #5
Calculations for Fill Area if Access Ramp relocated.
Category: MaintenanceMarket: ChemicalLocation: USATemporary Crude AN Receiving
Design temporary piping for unloading Crude AN.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAAluminum Transfer Facility Appraisal
Category: Engineering AnalysisMarket: ChemicalLocation: USAUpdate EFD'S for 350 Area
Perform EFD Walkdowns and update all files to CAD.
Category: MaintenanceMarket: ChemicalLocation: USAT670 Emissions
Detailed engineering and design (Mechanical). Project consisted of re-routing existing piping and PSV's for the existing flare/vent system.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAMove P805-3 to P805-2 Location to Facilitate Barge Loading from T804
Designed piping for relocation of Pump.
Category: Redesign-RetrofitMarket: ChemicalLocation: USADPVCM-Ethylene / Propylene Interchangers
New exchanger steel modifications for additional loading.
Category: On-site AssistanceMarket: ChemicalLocation: USAPipe Ditch/Overhead Rack Survey & Identification
Survey and document Piping in Ditch/Overhead Racks for Maintenance purposes.
Category: MaintenanceMarket: ChemicalLocation: USAP1 TF and R/C Pipe Rack Mod.
Pipe rack new level extension for additional piping. Foundation and steel calculations with detail design. +/-1000LF.
Category: On-site AssistanceMarket: ChemicalLocation: USAReactor E-6101 Replacement
EDC Reactor replacement structural steel modifications. Concrete structure and steel structure.
Category: Minor ExpansionMarket: ChemicalLocation: USAInstall Bridge at "G" street and Dock Road
Designed Bridge for Ditch crossing.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAInstall PCV's on Equistar's Light Product storage tanks
Designed Piping to install PCVs on N2 Piping to Tanks.
Category: Redesign-RetrofitMarket: ChemicalLocation: USABridge #10 Repair
Designed repairs for Bridge Columns and Footers.
Category: MaintenanceMarket: ChemicalLocation: USAReplace Sections of NESHAP Piping pre MTS Recommendations
Designed replacement piping for corroded piping, like for like.
Category: MaintenanceMarket: ChemicalLocation: USADike Wall Erosion Repairs
Designed repair for leak in concrete Dile Wall.
Category: MaintenanceMarket: ChemicalLocation: USAConstruct Elevated Platform in Pipe Rack South of 70C101
Designed Platform for Pipe Rack.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAOn-site drawing scans
On-site drawing scans
Category: Minor ExpansionMarket: ChemicalLocation: USARepair Damageg Structural & Piping at 70XV114-2 (S/D 104)
Designed repairs for damaged structural steel and piping.
Category: MaintenanceMarket: ChemicalLocation: USA70C101 Air Compress System Repairs, 24" Steam Line to C101
Stress Calculations on 24" Steam Line, designed Stop & Support to prevent damage..
Category: MaintenanceMarket: ChemicalLocation: USAInstall platform around T16
Designed access platform around T16 for Clean Out Nozzles.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAInstall Piping to Pump from 320P805-2 around 320P805-3
Designed Piping for Product Transfer Pump.
Category: Redesign-RetrofitMarket: ChemicalLocation: USADesign & Install Seal Pot w/Alarm to Control House from 320P976-2
Designed Piping and Seal Pot w/Alarm to Control House.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAReplace Pilot Ignition System on Reactor Air Heater
Replaced pilot ignition system on reactor air heaters.
Category: MaintenanceMarket: ChemicalLocation: USAMiddle Rack Secondary Containment-Preliminary Engineering & Estimate
TIC Estimate and Front End Engineering.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA70T105 Explosion Hatches
Designed Explosion Hatches for Tank.
Category: Redesign-RetrofitMarket: ChemicalLocation: USADocument/Redline/Change 24VDC Power Distribution
Updated Unit Documentation on 24 Volt Power System
Category: MaintenanceMarket: ChemicalLocation: USAPO Rail Unloading at U1
R/C unloading rack expansion. Structural steel modifications with new gangway and cage. Piping modifications to include new control station, Micro motion flow meter and loading arm for Propylene Oxide.
Category: Redesign-RetrofitMarket: ChemicalLocation: USASet up 70E202-3 as a Spare 70E503
Reworked piping so that existing exchanger could be used as spare for another service.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAHCL Replacement
Demo existing HCL system and replace with H2504 Tote System.
Category: Redesign-RetrofitMarket: ChemicalLocation: USARepair Nat Gas Line (E & 7th St. Area)
Designed repairs for natural gas line (E & 7th street) area.
Category: MaintenanceMarket: ChemicalLocation: USAMarch 2006 HPDA Outage Work
Designed Piping to replace 4 existing instruments with upgraded instruments.
Category: MaintenanceMarket: ChemicalLocation: USAPlatform for portable water filters
TIC Estimate and Design for Access Platform.
Category: MaintenanceMarket: ChemicalLocation: USAHot stopple of 350T1-2 connecting line
Designed installation of cross stopple for installation of piping and valves for tank.
Category: Redesign-RetrofitMarket: ChemicalLocation: USACost Estimate for 320T161's Radar Access Platform
TIC Estimate for 320T161's Radar Access Platform.
Category: MaintenanceMarket: ChemicalLocation: USACogen Desecrator Tank Replacement
Structural steel modifications for vessel replacement. R/R corroded steel with new.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA320T823-3 Piping Revisions
Designed Piping modifications on tank to install N2 Blanket..
Category: Redesign-RetrofitMarket: ChemicalLocation: USAReplace Sump Line Between
Designed replacement of Sump Line.
Category: MaintenanceMarket: ChemicalLocation: USACL2 Suction Chiller
Chlorine chiller expansion pot. Cold service piping and stress analysis. Four new pumps and control stations.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAP1 Sugar Feed to D-101
Structural steel modification for pneumatic sugar feed to reactor to sustain piping and bag house on top of reactor.
Category: Redesign-RetrofitMarket: ChemicalLocation: USALPVCM-Railcar Fall Protection
Update railcar gangways, safety cages and for loading VCM, Chlorine and R/C cleanout. 8 spots.
Category: Redesign-RetrofitMarket: ChemicalLocation: USARailcar Fall Protection
Update railcar gangways, safety cages and for loading Acid, Chlorine and decontamination. 6 spots.
Category: Minor ExpansionMarket: ChemicalLocation: USARe-route 10 PSV's back to 320T971-1
Designed piping to re-route 10 PSV's outlet piping back to 320T971-1.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAAcid Purge
TIC Estimate forAcid Purge Revisions. Project Canceled.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA450# Steam Line Sleeper Repair "F" Street
Designed in Structural repair for broken Concrete Sleeper.
Category: MaintenanceMarket: ChemicalLocation: USAOn-site LPVCM
On-site LPVCM
Category: Redesign-RetrofitMarket: ChemicalLocation: USAWaste Water Compliance Project
Designed Slab for Instrumentation
Category: Redesign-RetrofitMarket: ChemicalLocation: USAReplace the "C" Street Domestic Sewer Line
Designed the replacement piping for the "C" Street Domestic Sewer Line.
Category: MaintenanceMarket: ChemicalLocation: USAReplace Domestic Sewer Line from S2 Sump
Designed the replacement piping for the S2 Domestic Sewer Line.
Category: MaintenanceMarket: ChemicalLocation: USAHRVOC
Emission control mechanical detail design project. New control station, piping, revisions.
Category: Redesign-RetrofitMarket: ChemicalLocation: USACulvert Replacement
Design Culvert replacement and area Grading for Drainage.
Category: MaintenanceMarket: ChemicalLocation: USAAbsorber Off Gas Revisions
Design Double Block and Bleed by adding 30 inch butterfly valve
Category: Redesign-RetrofitMarket: ChemicalLocation: USAInterlocks
Update and verify interlock types, service, and descriptions.
Category: MaintenanceMarket: ChemicalLocation: USADPVCM Paid Verification
+/-250 P&ID as builts. Field walk down for Mechanical and I&E. CAD updates. VCM plant.
Market: ChemicalLocation: USAConduct Expansion Loop Calc. on the 450#
Conduct expansion loop calculations on the 450# steam headers, including the conditions When Unit is exporting 700 degree steam into the header.
Category: MaintenanceMarket: ChemicalLocation: USAChange 55PCV108-1/2/3 to Butterfly Control Valves
Design replacement piping to change control valves to butterfly type valves.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAMP Boiler Feed water Pump Recirculation Line
Redesign piping for boiler feed water pumps for better work clearances.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA70T204 Settling Revisions
Design new overflow system for Settling Tank.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAFee Support for R&D Relocation
Fee Support for R&D Relocation
Category: Redesign-RetrofitMarket: ChemicalLocation: USADemo Out of Service Electrical on the Docks
Cleaned up the electrical on dock 4.
Category: MaintenanceMarket: ChemicalLocation: USAReverse Osmosis Tank Outage
Repaired tank and nozzles, reworked piping for streamlined operations.
Category: MaintenanceMarket: ChemicalLocation: USAHydraulic Study of Cooling Tower System
Preformed Hydralic Study of efficiency of Unit Cooling Tower Water System.
Category: MaintenanceMarket: ChemicalLocation: USAInstall Cross Stopple on the 450#s STM Line
Design installation of cross stopple on the 450# steam line in "F" st. pipe ditch for Maintenance.
Category: MaintenanceMarket: ChemicalLocation: USARelief Systems Phase II
PSV (relief valve) verification and documentation.
Category: MaintenanceMarket: ChemicalLocation: USAContractor Administrative - Chemic RSO
Client manager
Market: ChemicalLocation: USAHMD Project
Detailed piping design with I&E modifications for the shared second phase of the HMD project. Baytank assigned tasks for completion of construction package. Phase involved mechanical design of a small scrubber type vessel & flare piping revisions.
Category: Minor ExpansionMarket: ChemicalLocation: USAHRVOC Monitoring Compliance Project
Designed Nozzle connections on Flares for Flow Instrumentation Installation and design barricades for Instrument Boxes.
Category: Redesign-RetrofitMarket: ChemicalLocation: USASTS Equipment Conversion
Updated EFD and Equipment Documentation after Demo of Unit for all Equipment that was saved and reused. Renumbered Equipment and Drawings as required.
Category: MaintenanceMarket: ChemicalLocation: USA83E13 TIC Upgrade
Upgraded temperature controllers.
Category: MaintenanceMarket: ChemicalLocation: USALa Porte VCM Paid Verification
+/-150 P&ID as builts. Field walk down for Mechanical and I&E. CAD updates. VCM plant.
Market: ChemicalLocation: USAOn-Site Services
N/A On-site
Category: On-site AssistanceMarket: ChemicalLocation: USAP&ID Updates
+/-100 P&ID as builts. Field walk down for Mechanical and I&E. CAD updates, PVC unit.
Market: ChemicalLocation: USANitrogen Cooling Tower Additions
Add cell for cooling tower basin. Basin was made of concrete slab & wall, once new cell was installed the existing concrete basin wall was core drilled (3-20"0 holes). For cooling water circulation to the new basin.
Category: Minor ExpansionMarket: ChemicalLocation: USAT311 Low Water Draw and Recycle Line Revision
Modified piping to do away with low water draw on tank.
Category: MaintenanceMarket: ChemicalLocation: USAOn-Site Services
N/A On-site
Category: On-site AssistanceMarket: ChemicalLocation: USAModify Docks 2 & 3 Flush Headers & Sample Pts
Designed new piping on dock 3 to make sure there is not cross contamination of Products.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAAdd Zeolite Waterline to 83S14
Run new 2" stainless steel pipe and change out part of zeolite water pipe.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAT56-1 Storage Tank Repair
Converted manual drawings of Tank to CAD, including coils, plan, and elevation. Update dimensions as required.
Category: MaintenanceMarket: ChemicalLocation: USAInstall Flow Meters on 55E6'S
Replaced mass flow meters.
Category: MaintenanceMarket: ChemicalLocation: USAWHB Reliability Improvements
Upgraded gas controls.
Category: MaintenanceMarket: ChemicalLocation: USAAdd Additional Venting Per Equistar to 320T92
Designed additional venting, including Nozzle and Conservation Vent.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAStructural Steel, Grating & Floor Plate Replace
Structural steel, concrete and floor plate replacement.
Category: MaintenanceMarket: ChemicalLocation: USARupture Disc
Market: ChemicalLocation: USACT3 Piping & Electrical Replacement
Piping and electrical replacement.
Category: Redesign-RetrofitMarket: ChemicalLocation: USARepair Damaged Steam Piping
Draw EFD's of utility piping in "C" street ditch from 7th to DPO, complete turn in of all dwgs from outage.
Category: MaintenanceMarket: ChemicalLocation: USASulfuric Acid Line Replacement
Replace sections of sulfuric piping in ditches per MTS recommendations.
Category: MaintenanceMarket: ChemicalLocation: USAPipe Stress Analysis for PTFE lined piping
Provide stress/piping flexibility for lined piping system between exchangers and check the alignment of PTFE expansion joint from overstretch and within the allowable offset.
Category: Engineering AnalysisMarket: ChemicalLocation: USAOn-Site Services
N/A On-site
Category: On-site AssistanceMarket: ChemicalLocation: USARelay Coordination Project
Review existing system, one-line diagrams, coordination plots, relay settings/test sheets. Provide short-circuit study & analysis, plot new coordination curves, provide written report w/suggested changes in order to realize improvements in the system
Category: Engineering AnalysisMarket: ChemicalLocation: USAP4 Tank Farm Expansion
Six finished Polyols product tanks. 100k gallon with positive displacement pumps, process area manifold modifications, T/T and R/C loading facilities with loading arms. Foundations, piping, and power scope.
Category: Major ExpansionMarket: ChemicalLocation: USAInstall Redundant XV's on 70K305-1 Drain Line
Designed installation of redundant Control Valves on the 70K305-1 drain line.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAAWT Formulation Project TIC
10% total installed costs for AWT formulation project.
Category: Minor ExpansionMarket: ChemicalLocation: USARevise Circulating Water Purge Piping
Revised circulating water purge piping.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAPSV Header at VCM Tank Farm
VCM Sphere tank farm header thermal expansion PSV's and expansion pot. New design. Foundations and piping.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAFormalin Tank Hi Level Improvement
Install new 2"-150 nozzles in existing tank manways. Install new Hi level probes and remove existing Hi level probes and install blind flanges as requied.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAE&C Pkg. Witte Class
Detailed design for installation classifer.
Category: Minor ExpansionMarket: ChemicalLocation: USAHAZOP Related Project
Designed 30D5 filter drain revisions, 30RI vent revisions and 30T2 sulfuric acid revisions.
Category: MaintenanceMarket: ChemicalLocation: USASouth Teal Unit # Ethylene Capping
South Teal Unit # Ethylene Capping
Category: MaintenanceMarket: ChemicalLocation: USARCRA Line Repair
Replace section of pipe in ditch like for like.
Category: MaintenanceMarket: ChemicalLocation: USAUpgrade SO2 Flow Meters
Upgraded SO2 flow meters. Redesigned piping for new meters.
Category: Redesign-RetrofitMarket: ChemicalLocation: USADock 3 Piping Modifications
Replaced sections of piping under Dock 3 due to heavy corrosion.
Market: ChemicalLocation: USAMCS Sump Piping Replacement
Replaced the sump piping like for like with an updated spec.
Category: MaintenanceMarket: ChemicalLocation: USAChlorine Transfer Line
Chlorine Transfer Line
Category: MaintenanceMarket: ChemicalLocation: USAOn Dock 5
Redesigned piping to remove old emission points and unused PSV's and replace with new pipe.
Category: MaintenanceMarket: ChemicalLocation: USAD308 Bottoms to D203 Bottoms
Piping project canceled
Category: Redesign-RetrofitMarket: ChemicalLocation: USA51D6 TETF Alternate
Designed installation of 3" C.S. line from connection @ 51D6 to west side of unit (No pockets). A temporary scrubber will be supplied and shall connect to 3" line from 51D6
Category: MaintenanceMarket: ChemicalLocation: USAC4/Truck Flare Flow Estimation (85%)
Flare calculations for air permit application.
Category: MaintenanceMarket: ChemicalLocation: USAA300 Revisions
Designed new piping from Unit to 320T523 Storage Tank. Designed new piping for Benzene recycle line and new piping for a fresh benzene line.
Category: MaintenanceMarket: ChemicalLocation: USABurner Assembly
Provide detail engineering design and fabrication drawings on special burner tip.
Category: Engineering AnalysisMarket: ChemicalLocation: USAEnclosure for R-1002A&B Design
Enclosure on top of existing reactor structure. Add. steel structure framing, building roof & metal siding were added on top of existing reactor. For prevention of outside moisture reacting w/catalyst during installation of new catalyst in the reactor.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA384 Interlock Reviews - Air Comp
Investigation of the existing interlocks in the new unit & developing a database with the end goal being the verification & documentation of all interlocks. SIS related items
Category: On-site AssistanceMarket: ChemicalLocation: USA369 Interlock Reviews - Super Turbine
Investigation of the existing interlocks in the new unit & developing a database with the end goal being the verification & documentation of all interlocks. SIS related items
Category: On-site AssistanceMarket: ChemicalLocation: USA350 Interlock Reviews - Boilers
Investigation of the existing interlocks in the new unit & developing a database with the end goal being the verification & documentation of all interlocks. SIS related items
Category: On-site AssistanceMarket: ChemicalLocation: USAFlare Replacement IMPR Phase 2 (Second part of 7010)
Detailed Design and Field Follow-up of Installation of Piping for Flare Replacement
Category: Redesign-RetrofitMarket: ChemicalLocation: USAPriller Feed Pump & Piping
Provide revised construction package and installed one additional new Priller unit
Category: Minor ExpansionMarket: ChemicalLocation: USAPriller Feed Pump & Piping
Provide construction package on balance of plant piping with steam blister, pumps, structural pipe bridge and utilities /power supply in sulphrur terminal facility
Category: Minor ExpansionMarket: ChemicalLocation: USA8000 Wire Revision
Update existing wiring diagrams
Category: MaintenanceMarket: ChemicalLocation: USARelocate and Replacement of Flow and Pressure Transmitters
Detailed Design of relocation and/or replacement of Flow and Pressure Transmitters
Category: MaintenanceMarket: ChemicalLocation: USAProvide Personnel Resource (1 person) for Upcoming Shutdown
Provide Personnel Resource (1 person) for Upcoming Shutdown-Interlock Testing
Category: On-site AssistanceMarket: ChemicalLocation: USANet Absorber Bottoms Stripper
Add Column to Process Stream
Category: Minor ExpansionMarket: ChemicalLocation: USAFabrication Drawings Vertical Riser
Category: Redesign-RetrofitMarket: ChemicalLocation: USAMCC Startup Support
On-site personnel for activation of new MCC
Category: On-site AssistanceMarket: ChemicalLocation: USABurner Management System Upgrade
Piping Revisions for Upgrade of Furnace Burner Management System
Category: Redesign-RetrofitMarket: ChemicalLocation: USASugar Silo FDN and Steel Design
Market: ChemicalLocation: USASaturation Vessel Discharge Tube Modifications
Market: ChemicalLocation: USAInspection Isometric Sketches
Category: On-site AssistanceMarket: ChemicalLocation: USASKM Modeling of Plants Electrical System
Software modeling for Arc Flash Studies
Category: On-site AssistanceMarket: ChemicalLocation: USATank Replacement
Category: Redesign-RetrofitMarket: ChemicalLocation: USACAD designer for P&ID markups
Category: On-site AssistanceMarket: ChemicalLocation: USABEM Plant Expansion Front End Engineering Phase I
Category: Major ExpansionMarket: ChemicalLocation: USAProvide Personnel Resource (1 Person) to coordinate effort for spares
Hot-spare set up - communication to CMG and Delta V
Category: On-site AssistanceMarket: ChemicalLocation: USAEpler & Gibson
Category: On-site AssistanceMarket: ChemicalLocation: USABuild Road Grating Crossing to Cover Exposed Piping at Dock Road
Replace Road Crossing Over Piping
Category: Redesign-RetrofitMarket: ChemicalLocation: USAProvide Personnel Resource (1 Person) for upcoming shutdown
Interlock Testing
Category: On-site AssistanceMarket: ChemicalLocation: USAUpgrade Ven System on 320T233-1
Replace N2 System on Tank
Category: Redesign-RetrofitMarket: ChemicalLocation: USAFuel Gas Line, Hot Stopple and Line Repairs
Replace Bad Piping
Category: MaintenanceMarket: ChemicalLocation: USATars B Tank Replacement
Category: Redesign-RetrofitMarket: ChemicalLocation: USAEngineering Study for 478' long Pipe Rack Bridge
Category: Engineering AnalysisMarket: ChemicalLocation: USAOn-site Inspections Designer
Category: On-site AssistanceMarket: ChemicalLocation: USAEFD Update Project, Phase 2
Walkdown and Update EFD's
Category: Engineering AnalysisMarket: ChemicalLocation: USAFlare Pilot Gas Lines - Part 1
Replace existing Piping
Category: Redesign-RetrofitMarket: ChemicalLocation: USAProvox Upgrade
Upgrade Provox System
Category: Redesign-RetrofitMarket: ChemicalLocation: USANet Absorber Bottoms Stripper
Add Column to Process
Category: Minor ExpansionMarket: ChemicalLocation: USARoof Modifications
Category: Redesign-RetrofitMarket: ChemicalLocation: USAUpgrade HCN Low Flow
Upgraded HCN flow meters. Redesigned piping for new meters.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAReplace Raff II Barge Loading Pipeline
Replacement of existing piping with line size increase from 8 inch to 10 inch on new piping.
Category: MaintenanceMarket: ChemicalLocation: USA55R4 HCN Analyzer
Designed piping and instrumentation for installation of HCN analyzer.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAPortable Water Line
TIC Estimates and Front End Engineering for replacement of Potable Water Piping.
Category: MaintenanceMarket: ChemicalLocation: USATank Farm Instrument Upgrade
Designed upgrades for Level Control Instrumentation.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAHRVOC Analytical Test
TIC Estimates and design of installation of flanged outlets on flare stacks for Flow Instruments.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA40R1-R2 Raw Materials Delivery
Design piping revisions for 40R1/R2 raw material delivery enhancement.
Category: MaintenanceMarket: ChemicalLocation: USAAbsorber Off Gas Vent Revisions
Designed Double Block and Bleed by adding 30 inch butterfly valve
Category: Redesign-RetrofitMarket: ChemicalLocation: USAFlare Knockout Pot Revisions
Designed replacement can on Flare.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA57T4 Reflux Tank Replacement
Designed additional steam tracing supply condensate return for vessel, Update P&ID's.
Category: MaintenanceMarket: ChemicalLocation: USAInstall Sonar Device on 57T20
Install sonar device, including wire pulling from MCC and new junction box.
Category: MaintenanceMarket: ChemicalLocation: USABoiler Fuel Gas Drawing
Replaced expansion loop in pipe ditch.
Category: MaintenanceMarket: ChemicalLocation: USADemo NH3
Demo existing piping and reroute to remove existing ammonia drains from the "clean water" drains.
Category: DemolitionMarket: ChemicalLocation: USATSS Solids Analyzers
Modified piping and added instrumentation for analyzing process wastes.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAReplace Line II 40E16& 40E32 Heat Exchangers
Replaced Exchangers like for like.
Category: MaintenanceMarket: ChemicalLocation: USA150# Steam Line Repairs
Replaced damaged Steam Piping, performed Stress Calculations as required.
Category: MaintenanceMarket: ChemicalLocation: USAPiping Modification on Propylene Pumps
Modified piping configuration to streamline operations.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAReplace Plant Railroad Bridge
Acquired Vendors for Railroad Bridge Replacement. Helped w/TIC Estimate.
Category: MaintenanceMarket: ChemicalLocation: USAReplace N. / S. Clean Water Ditch Diversion Valves
TIC Estimate and Front End Engineering.
Category: MaintenanceMarket: ChemicalLocation: USACWD Diversion Valves
Revision of concrete outfall dam to install slide gate valves, replacement of diversion gate valves, and removal of catwalk.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAHMD-Tank 87-01 PWO-0522
Detailed piping design, shared project w/Baytank. Project for retrofit an existing storage tank for the purpose of switching products (HMD). Chemic was assigned P&ID pickups, piping design work outside the tank "bay", pipe rack piping runs, rail car
Category: Minor ExpansionMarket: ChemicalLocation: USARepair Bank Erosion
Design repairs for bank erosion including Gunite installation on Banks, removal of sediment in ditch, and reworking drainage channels.
Category: MaintenanceMarket: ChemicalLocation: USAUpdate EFDs & Loop Drawings
Update formalin EFD's and loop drawings.
Category: MaintenanceMarket: ChemicalLocation: USA55H2 Burner Management Upgrade
TIC Estimate for upgrading Piping and Instrumentation Controls of Heater Burner System.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA55H2 Burner Management Upgrade
Design upgrade for Piping and Instrumentation Controls of Heater Burner System, including Gas Flow Calculations..
Category: Redesign-RetrofitMarket: ChemicalLocation: USAPotable Water Distribution Header Study
TIC Estimate for replacement of plant potable water supply system.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAOverhead Cyanide Pipe Support
Design repair of damaged Overhead Cyanide Pipe Support.
Category: Redesign-RetrofitMarket: ChemicalLocation: USARCRA Tank Cert 336T1&2 and 336T2-1
PE Certification for tanks used in RCRA service.
Category: MaintenanceMarket: ChemicalLocation: USAC St Steam Lines Modification
TIC Estimates for redesigning the Plant 450# Steam Supply System. Installed thermowells for Temperature Instrumentation and Tie-ins for Future Piping.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA377N3 Agitator
Replace gear box and agitator.
Category: MaintenanceMarket: ChemicalLocation: USAPropylene Area Tie Points
Cleaned up excess piping not needed with miscellaneous piping modifications.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAInstall and Test Thermo-Degasser for 30C2 Oil System
TIC Estimate for Installation and Testing of Portable Thermo-Degasser for 30C2 Oil System.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAInstall and Test Thermo Degasser for 30C2 Oil System
Designed piping for installation of Portable Thermo-Degasser for 30C2 oil System. Help with Testing Procedures.
Category: Redesign-RetrofitMarket: ChemicalLocation: USATruck Scale and Paving Projects
Paving for plant entrance and installing a truck scale for weighing trucks when they come in and out. Also, to record the delivered material in to the plant.
Category: Minor ExpansionMarket: ChemicalLocation: USA1710/LPVCM "C" Hot Quench Column A
Brick lined reactor replacement with like kind. Total station survey. Vendor fabrication drawing review. Oxyhdrochlorination Hot Quench column. 12'-3" dia. X 37'-10" T/T
Category: Minor ExpansionMarket: ChemicalLocation: USAInstall Mud Boot Cross Stopple on the 50# Steam Line
Designed installation of cross stopple in mud boot in the 50# Steam Line for Maintenance.
Category: MaintenanceMarket: ChemicalLocation: USANew T 315 CVO Assembly
Modified piping atop of tank to keep vent system from polymerizing.
Category: Redesign-RetrofitMarket: ChemicalLocation: USA57T5 Vent to 55H2 Furnace
Addition re-pulls of bad cable, redesign using interposing relays because of induced voltages.
Category: Redesign-RetrofitMarket: ChemicalLocation: USAOn-site DPVCM
On-site DPVCM
Category: On-site AssistanceMarket: ChemicalLocation: USAPO/EO Railcar Loading Expansion
Civil engineering and piping detailed design for expansion of four railcar loading platforms and pipe racks, including retrofit of existing platform.
Category: Major ExpansionMarket: ChemicalLocation: USA