Resources

The Problem: Faced with water leakage and a failed installation of a newly built cooling tower basin, a leading specialty chemical company was in need of a quick diagnosis and reliable method of repair to ensure the future structural integrity of this critical utility. Prior......

The Purpose: Completion of a new NGL recovery facility train, with a tight project deadline Cryogenic turbo expander processing plants separate natural gas liquids (NGL) from natural gas. Our client chose modular, skid-mounted equipment to compress delivery time and simplify installation in the field. Faced......

The Problem: Practical answers needed to replace a limited and failing deployment of past safety engineering Activated Carbon is designated a BACT (Best Available Control Technology) by the EPA for the removal of VOCs (volatile organic compounds), and our client had installed a significant number......

The Problem: Innovative solutions needed for replacing aging piping infrastructure while maximizing uptime and solving long-term issues When our Client approached Chemic to help with reimagining the systems at their Houston Cogen facility that carried the lifeblood for their massive boilers and generators, we knew......